Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
152 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 7 | SL 353: 0017-01-025; OV | BEXAR | 2025-07-01 | $4,254,745.10 | $3,232,998.95 |
| Rank 3of 5 | RM 3404 - FY 25 SSWP | LLANO | 2025-07-01 | $1,327,789.71 | $1,179,799.95 |
| Rank 9of 11 | US 183 0.7 MI SOUTH SH 16 to Lampasas CL | MILLS | 2025-06-05 | $5,828,606.30 | $4,457,729.70 |
| Rank 4of 6 | IH 410: 0521-05-151; OV | BEXAR | 2025-05-01 | $10,518,394.56 | $9,693,874.28 |
| Rank 5of 6 | US 90-S. of Mesquite to 0.20 W OF PLUM C | CALDWELL | 2025-04-04 | $5,587,596.37 | $4,315,552.20 |
| Rank 5of 5 | FM 1660 - King Ln to FM 973 | WILLIAMSON | 2025-03-05 | $6,525,635.10 | $3,853,029.88 |
| Rank 8of 9 | RM 32: 0511-02-028:SFT | COMAL | 2025-03-04 | $4,874,469.40 | $3,391,550.27 |
| Rank 6of 6 | 0140-13-020 IH 10 ACP OVERLAY | CROCKETT | 2025-02-06 | $31,365,593.14 | $24,564,336.71 |
| Rank 6of 6 | US183 AVE E TO NINTH ST MILL&OVERLAY | LAMPASAS | 2025-01-08 | $1,754,157.75 | $1,066,349.58 |
| Rank 6of 6 | Sh 29 From Autumn Ave to Wells Ave | LLANO | 2025-01-08 | $2,399,229.60 | $1,386,822.50 |
| Rank 2of 3 | PREVENTIVE MAINTENANCE | MCCULLOCH | 2024-11-07 | $4,516,277.48 | $3,936,577.18 |
| Rank 2of 7 | SEAL COAT | MASON | 2024-09-06 | $1,819,844.60 | $1,748,508.34 |
| Rank 5of 8 | REHABILITATE EXISTING ROADWAY | MEDINA | 2024-06-06 | $8,908,270.43 | $6,964,196.97 |
| Low bidof 4 | RECONSTRUCT EXISTING ROADWAY | MILLS | 2024-06-05 | $32,511,818.26 | $32,511,818.26 |
| Rank 7of 9 | BRIDGE REPLACEMENT | KERR | 2024-04-04 | $1,997,331.20 | $1,193,211.00 |
| Rank 4of 6 | WIDEN ROAD - ADD LANES AND SHOULDERS | BLANCO | 2024-03-06 | $11,719,482.47 | $11,189,111.15 |
| Rank 2of 2 | RESURFACE ROADWAY | BROWN | 2024-03-05 | $5,321,465.89 | $5,210,426.35 |
| Low bidof 4 | MILL AND INLAY | COLEMAN | 2024-02-02 | $1,840,800.40 | $1,840,800.40 |
| Rank 3of 5 | HAZARD ELIMINATION & SAFETY | EASTLAND | 2024-02-01 | $23,298,155.70 | $21,627,296.53 |
| Rank 2of 5 | RESURFACE ROADWAY | MILLS | 2024-01-05 | $12,530,285.23 | $11,688,750.48 |
| Low bidof 2 | RESURFACE ROADWAY | BROWN | 2024-01-05 | $8,999,249.67 | $8,999,249.67 |
| Low bidof 3 | RESURFACE ROADWAY | COLEMAN | 2024-01-04 | $14,784,351.67 | $14,784,351.67 |
| Rank 4of 6 | REPAIR ROADWAY | KENDALL | 2024-01-04 | $4,444,444.44 | $3,751,987.90 |
| Rank 4of 4 | FLEXIBLE BASE | RUNNELS | 2023-12-12 | $209,488.00 | $102,221.00 |
| Rank 3of 4 | FLEXIBLE BASE | CONCHO | 2023-12-12 | $180,333.00 | $161,409.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.