Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
11 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | IH 10 EBFR: FM 1489 to FM 359 | WALLER | 2026-03-05 | $307,556.00 | $299,551.60 |
| Rank 3of 5 | MILLING | SUTTON | 2024-08-02 | $1,422,347.86 | $1,277,999.26 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | JASPER | 2022-11-03 | $1,199,253.62 | $1,199,253.62 |
| Rank 2of 4 | RESURFACE ROADWAY | MCLENNAN | 2022-08-04 | $1,886,127.80 | $1,097,170.23 |
| Rank 3of 3 | PREVENTIVE MAINTENANCE | HUDSPETH | 2022-06-30 | $2,628,176.80 | $1,895,554.80 |
| Rank 4of 7 | REHABILITATE EXISTING ROADWAY | DALLAS | 2021-11-04 | $2,614,938.26 | $2,257,307.01 |
| Rank 6of 7 | HAZARD ELIMINATION & SAFETY | DALLAS | 2021-08-05 | $2,158,493.17 | $1,659,487.10 |
| Rank 4of 5 | PREVENTIVE MAINTENANCE | EL PASO | 2021-07-01 | $1,650,285.40 | $1,097,605.94 |
| Rank 5of 5 | HAZARD ELIMINATION & SAFETY | HUDSPETH | 2021-04-07 | $3,359,530.35 | $1,994,619.34 |
| Rank 3of 4 | SURFACE TEXTURING FOR SKID RESISTANCE | WILLIAMSON | 2019-08-07 | $10,673,146.57 | $8,092,997.14 |
| Low bidof 6 | REPAIR CONC, DIAMOND GRIND, PAV MARK | TARRANT | 2018-03-06 | $1,297,564.52 | $1,297,564.52 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.