Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
121 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 9of 13 | CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENT | COLLIN | 2021-02-05 | $308,308.00 | $197,225.00 |
| Rank 4of 6 | INTERSECTION IMPROVEMENTS | WICHITA | 2021-02-04 | $3,064,272.40 | $2,851,006.38 |
| Rank 11of 12 | BRIDGE REPLACEMENT | GRAYSON | 2021-02-04 | $515,216.00 | $334,514.50 |
| Rank 6of 6 | CLEAN/SEAL JOINTS/EROSION CNTRL/CONC REP | NEWTON | 2021-01-07 | $699,590.00 | $303,665.00 |
| Rank 7of 14 | BPM - BRIDGE REPAIRS | COLLIN | 2020-12-03 | $413,440.00 | $348,405.00 |
| Rank 6of 16 | REPLACE BRIDGE AND APPROACHES | ELLIS | 2020-12-02 | $2,825,862.43 | $2,491,390.02 |
| Rank 2of 9 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2020-12-02 | $407,700.00 | $404,070.00 |
| Rank 3of 9 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2020-12-02 | $410,975.00 | $398,600.00 |
| Rank 6of 8 | BRIDGE DECK AND RAIL REPAIR | HUNT | 2020-11-19 | $206,575.00 | $155,950.00 |
| Rank 5of 7 | REPAIR OF EXISTING BRIDGE BEAM | PALO PINTO | 2020-11-19 | $66,000.00 | $41,824.00 |
| Rank 11of 14 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2020-11-05 | $1,137,550.72 | $839,520.37 |
| Rank 4of 7 | MISCELLANEOUS CONCRETE REPAIR | KAUFMAN | 2020-10-23 | $202,940.00 | $190,350.00 |
| Low bidof 5 | REPAIR/REPLACE CONCRETE BARRIER | KAUFMAN | 2020-10-08 | $229,545.00 | $229,545.00 |
| Rank 3of 11 | BRIDGE REPLACEMENT | TARRANT | 2020-10-01 | $888,751.78 | $879,188.44 |
| Rank 8of 12 | BRIDGE REPLACEMENT | TARRANT | 2020-10-01 | $1,277,570.50 | $1,053,948.34 |
| Rank 4of 7 | BRIDGE PREVENTATIVE MAINTENANCE | TARRANT | 2020-09-03 | $378,760.00 | $275,544.00 |
| Low bidof 9 | BRIDGE REPLACEMENT | TARRANT | 2020-08-06 | $516,409.00 | $516,409.00 |
| Rank 4of 8 | BRIDGE REPLACEMENT | TARRANT | 2020-08-05 | $615,777.00 | $533,000.00 |
| Rank 7of 7 | UPGRADE BRIDGE AND APPROACH RAILING | WICHITA | 2020-04-08 | $1,392,696.00 | $948,263.90 |
| Low bidof 3 | MISCELLANEOUS CONCRETE REPAIR | COLLIN | 2020-03-10 | $166,515.00 | $166,515.00 |
| Rank 2of 4 | CULVERT CLEANING & DITCH MAINTENANCE | COLLIN | 2020-03-10 | $331,046.00 | $290,941.68 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.