Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
34 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 7 | SH 11 from US 259 to Cass C/L | MORRIS | 2026-08-05 | $10,759,104.58 | $10,759,104.58 |
| Rank 7of 7 | US 82 from Red River C/L to W of US 259 | BOWIE | 2026-03-04 | $67,620,237.50 | $54,806,521.61 |
| Rank 5of 9 | SH 49 from SH 155 to Marion C/L | CASS | 2025-10-08 | $13,823,100.19 | $11,029,939.11 |
| Low bidof 5 | Daingerfield State Park | MORRIS | 2025-08-07 | $246,934.93 | $246,934.93 |
| Low bidof 9 | FM 21 Rehab | FRANKLIN | 2025-04-03 | $9,113,598.80 | $9,113,598.80 |
| Rank 2of 6 | Avery NETT SUP | RED RIVER | 2025-01-08 | $2,085,347.77 | $2,074,733.10 |
| Rank 2of 6 | WIDEN ROAD - ADD SHOULDERS | CASS | 2024-12-04 | $1,537,134.20 | $1,327,253.73 |
| Low bidof 5 | TREE REMOVAL | TITUS | 2024-11-20 | $186,448.20 | $186,448.20 |
| Rank 2of 6 | WIDEN ROAD - ADD SHOULDERS | UPSHUR | 2024-06-05 | $5,345,439.15 | $5,101,063.37 |
| Rank 5of 8 | BRIDGE REPLACEMENT | TITUS | 2024-06-05 | $933,484.50 | $723,296.87 |
| Rank 2of 7 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | RED RIVER | 2024-05-02 | $3,148,950.20 | $2,554,515.80 |
| Rank 2of 3 | REHABILITATE EXISTING ROADWAY | BOWIE | 2024-02-01 | $27,449,972.30 | $26,827,889.57 |
| Rank 4of 4 | REHABILITATE EXISTING ROADWAY | RED RIVER | 2023-06-27 | $12,750,037.15 | $9,798,191.22 |
| Low bidof 4 | RECONSTRUCT EXISTING 2-LANE HIGHWAY | TITUS | 2023-01-05 | $11,920,527.81 | $11,920,527.81 |
| Rank 2of 4 | REHABILITATE EXISTING ROADWAY | HUNT | 2022-10-07 | $7,074,115.52 | $6,681,139.87 |
| Rank 2of 9 | REPLACE BRIDGE AND APPROACHES | MARION | 2022-03-03 | $346,146.60 | $324,588.61 |
| Rank 2of 4 | REHABILITATION OF AN EXISTING 4 LANE HIGHWAY | TITUS | 2021-04-08 | $3,975,693.17 | $3,739,806.75 |
| Rank 3of 9 | CONSTRUCTION OF A NEW 2-LANE ROADWAY | CAMP | 2021-01-07 | $6,270,970.68 | $5,634,658.36 |
| Rank 5of 7 | REHABILITATION OF EXISTING ROAD | HOPKINS | 2020-11-05 | $4,956,639.89 | $4,389,010.57 |
| Rank 3of 7 | REHABILITATE EXISTING ROADWAY | LAMAR | 2020-07-08 | $2,380,026.16 | $2,265,145.83 |
| Rank 3of 6 | HIKE AND/OR BIKE | RED RIVER | 2020-07-08 | $917,209.50 | $682,513.10 |
| Rank 2of 7 | REHABILITATION OF EXISTING ROAD | RED RIVER | 2020-06-04 | $2,473,936.26 | $2,459,270.50 |
| Low bidof 7 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | RED RIVER | 2020-05-08 | $3,889,514.77 | $3,889,514.77 |
| Rank 4of 5 | 2R REHABILITATION | HOPKINS | 2020-04-08 | $3,928,487.00 | $3,763,142.16 |
| Rank 2of 6 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDO | RED RIVER | 2019-10-03 | $694,657.50 | $690,833.65 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.