Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
61 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 6 | MILL AND OVERLAY | TARRANT | 2017-04-05 | $5,033,863.50 | $4,616,649.64 |
| Rank 3of 5 | ADD SHOULDERS | COOKE | 2017-04-05 | $804,713.01 | $706,189.82 |
| Rank 2of 9 | FULL DEPTH REPAIR AND OVERLAY | MONTAGUE | 2017-04-05 | $5,227,463.80 | $4,894,838.28 |
| Rank 11of 11 | REALIGN EXISTING ROADWAY | EASTLAND | 2017-03-08 | $91,490,999.90 | $76,238,256.10 |
| Rank 3of 5 | MILL AND OVERLAY | TARRANT | 2017-03-08 | $3,174,842.50 | $2,966,572.10 |
| Low bidof 9 | FULL DEPTH REPAIR AND OVERLAY | COOKE | 2017-03-07 | $793,931.00 | $793,931.00 |
| Rank 5of 7 | GR, STRS, BASE, SIGN, DELIN & PAVE MRKRS | BEXAR | 2017-02-02 | $211,745,726.70 | $192,301,342.54 |
| Rank 4of 6 | GR, BS, ASPHALT PAV, PAV MK, SIGN | TARRANT | 2017-01-04 | $1,382,239.32 | $1,173,740.01 |
| Rank 4of 7 | RECONSTRT INTRCHANG-PHAS 1 PRIORITY DIRECT CONNECT | BEXAR | 2016-12-01 | $84,156,037.80 | $73,929,401.69 |
| Rank 12of 14 | GR,BS,DR,SURF | TARRANT | 2016-11-04 | $53,611,646.29 | $46,273,495.21 |
| Rank 7of 7 | REPAIR DRAINAGE STRUCTURES | COOKE | 2016-11-03 | $1,745,484.00 | $1,250,025.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.