Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
20 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 7 | US 287; FM 157 to Heritage Pkwy | TARRANT | 2026-09-02 | $3,858,768.13 | $2,623,266.87 |
| Rank 4of 4 | SH 171; Fr W Owen St to S of BB Fielder | PARKER | 2026-03-05 | $2,323,830.30 | $1,234,417.37 |
| Rank 4of 4 | IH 10 EBFR: FM 1489 to FM 359 | WALLER | 2026-03-05 | $377,640.38 | $299,551.60 |
| Rank 2of 5 | MILLING | SUTTON | 2024-08-02 | $1,309,811.38 | $1,277,999.26 |
| Rank 3of 3 | PREVENTIVE MAINTENANCE | EL PASO | 2024-06-05 | $1,344,556.77 | $1,050,190.66 |
| Low bidof 3 | PREVENTIVE MAINTENANCE | EL PASO | 2023-06-28 | $1,536,929.63 | $1,536,929.63 |
| Rank 3of 4 | RESURFACE ROADWAY | MCLENNAN | 2022-08-04 | $1,918,844.68 | $1,097,170.23 |
| Rank 2of 3 | PREVENTIVE MAINTENANCE | HUDSPETH | 2022-06-30 | $1,913,251.92 | $1,895,554.80 |
| Rank 5of 7 | REHABILITATE EXISTING ROADWAY | DALLAS | 2021-11-04 | $2,764,082.61 | $2,257,307.01 |
| Rank 5of 7 | HAZARD ELIMINATION & SAFETY | DALLAS | 2021-08-05 | $2,048,793.32 | $1,659,487.10 |
| Rank 5of 5 | PREVENTIVE MAINTENANCE | EL PASO | 2021-07-01 | $1,922,019.60 | $1,097,605.94 |
| Low bidof 5 | HAZARD ELIMINATION & SAFETY | HUDSPETH | 2021-04-07 | $1,994,619.34 | $1,994,619.34 |
| Rank 2of 6 | RESURFACE ROADWAY | TARRANT | 2020-05-07 | $4,235,996.87 | $3,195,838.30 |
| Rank 6of 7 | PREVENTIVE MAINTENANCE | JOHNSON | 2020-02-06 | $15,092,276.41 | $9,368,281.51 |
| Low bidof 4 | SURFACE TEXTURING FOR SKID RESISTANCE | WILLIAMSON | 2019-08-07 | $8,092,997.14 | $8,092,997.14 |
| Low bidof 4 | DIAMOND GRINDING & O/L,W/LP DETRS | BRAZORIA | 2018-07-10 | $4,772,337.96 | $4,772,337.96 |
| Rank 5of 6 | REPAIR CONC, DIAMOND GRIND, PAV MARK | TARRANT | 2018-03-06 | $1,767,996.81 | $1,297,564.52 |
| Rank 3of 7 | RUMBLE STRIPS CENTER AND EDGE LINE | COCHRAN | 2017-08-09 | $1,086,476.97 | $1,040,662.59 |
| Rank 6of 6 | RUMBLE STRIPS | PALO PINTO | 2017-06-06 | $257,560.41 | $131,854.90 |
| Rank 5of 5 | RUMBLE STRIP | ERATH | 2016-09-20 | $323,580.00 | $196,000.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.