Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
57 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 7 | IH 30 AT BASS PRO DRIVE | DALLAS | 2026-10-06 | $80,575,143.07 | $54,378,798.32 |
| Rank 6of 10 | US 80 WESTBOUND AT BUFFALO CRE-9503100 | KAUFMAN | 2026-10-06 | $67,191,699.66 | $55,012,735.47 |
| Rank 6of 11 | US 287; N of Harmon Rd to N of IH 35W | TARRANT | 2026-08-05 | $71,702,834.49 | $66,140,141.56 |
| Low bidof 4 | US 287 8 miles south of Bowie | MONTAGUE | 2026-08-05 | $11,180,257.88 | $11,180,257.88 |
| Rank 4of 9 | US 377 FROM SOUTH OF FM 1171 TO CRAWFORD | DENTON | 2026-05-06 | $123,505,894.01 | $111,363,901.00 |
| Rank 4of 6 | US 75 Segment 2 | GRAYSON | 2026-04-07 | $139,516,918.46 | $125,349,652.11 |
| Rank 6of 9 | US 67 AT LAKE RIDGE PKWY. | ELLIS | 2026-03-04 | $73,360,305.05 | $63,703,073.56 |
| Rank 8of 12 | FM 549 FROM SH 205 TO SH 276 | ROCKWALL | 2026-02-04 | $35,321,967.29 | $29,812,033.71 |
| Low bidof 11 | SS 394 From IH 35E to FM 877 | ELLIS | 2026-02-04 | $18,932,077.24 | $18,932,077.24 |
| Rank 3of 7 | US 81, Fruitland Rd to Wise CL | MONTAGUE | 2025-10-09 | $20,723,141.38 | $20,093,158.64 |
| Rank 8of 9 | US 83/84 Y INTERCHANGE | TAYLOR | 2025-10-08 | $82,273,502.63 | $72,482,832.00 |
| Rank 3of 8 | IH 35 from N of FM 455 to N of View Rd | DENTON | 2025-08-07 | $131,298,348.40 | $128,704,133.71 |
| Rank 4of 6 | IH 35E AT MAYHILL ROAD. | DENTON | 2025-06-05 | $142,831,266.83 | $123,539,232.30 |
| Rank 2of 6 | N. of US 80 to Windmill Farms Blvd. | KAUFMAN | 2025-03-05 | $84,051,634.44 | $80,359,417.06 |
| Rank 2of 4 | CONSTRUCT NEW ROADWAY LANES | COLLIN | 2024-12-03 | $176,408,933.63 | $157,359,015.04 |
| Rank 3of 3 | WIDEN ROAD - ADD LANES | GRAYSON | 2024-11-07 | $147,224,605.88 | $116,632,320.76 |
| Rank 6of 6 | BRIDGE REPLACEMENT | DENTON | 2024-08-02 | $15,674,618.60 | $11,749,150.19 |
| Low bidof 6 | WIDEN TO 6 LANE DIVIDED FREEWAY | COLLIN | 2024-01-04 | $88,035,840.22 | $88,035,840.22 |
| Rank 7of 7 | RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE URBAN | COLLIN | 2023-04-05 | $57,552,285.55 | $46,333,941.50 |
| Rank 2of 6 | WIDEN ROAD - ADD LANES | HUNT | 2023-01-05 | $33,662,452.42 | $30,044,518.47 |
| Rank 2of 5 | GR,PVMT,STR,SIGNS | COLLIN | 2022-06-29 | $33,636,317.88 | $31,480,212.92 |
| Rank 8of 8 | INTERCHANGE IMPROVEMENT | ELLIS | 2022-01-06 | $69,303,568.58 | $51,184,067.39 |
| Rank 4of 7 | RECONSTRUCT EXISTING ROADWAY | TARRANT | 2021-11-04 | $7,076,435.40 | $6,339,142.79 |
| Rank 4of 9 | CONSTRUCT NEW ROAD | GRAYSON | 2021-09-02 | $10,270,226.18 | $9,300,300.05 |
| Rank 6of 6 | WDN 4 TO 6 LN DIV W/ GRADE SEP, ADD RT/LT TURN LN | DENTON | 2021-08-04 | $169,114,672.84 | $140,553,393.21 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.