Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
133 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | ROADSIDE MOWING | WINKLER | 2018-02-06 | $183,291.52 | $172,028.00 |
| Low bidof 2 | ROADSIDE MOWING | REEVES | 2018-01-09 | $220,688.00 | $220,688.00 |
| Low bidof 2 | ROADSIDE MOWING | PECOS | 2018-01-09 | $297,328.00 | $297,328.00 |
| Low bidof 2 | ROADSIDE MOWING | MARTIN | 2018-01-09 | $198,528.00 | $198,528.00 |
| Low bidof 2 | ROADSIDE MOWING | WARD | 2018-01-09 | $258,680.00 | $258,680.00 |
| Low bidof 2 | ROADSIDE MOWING | ANDREWS | 2018-01-09 | $181,272.00 | $181,272.00 |
| Low bidof 2 | ROADSIDE MOWING | REEVES | 2018-01-09 | $286,858.00 | $286,858.00 |
| Low bidof 3 | ROADSIDE MOWING | TERRELL | 2018-01-09 | $183,549.60 | $183,549.60 |
| Rank 6of 11 | PAVEMENT MARKINGS | TOM GREEN | 2017-12-05 | $820,359.30 | $689,377.20 |
| Rank 5of 10 | RETRACE PAVEMENT MARKINGS AND MARKERS | TOM GREEN | 2017-12-05 | $387,505.42 | $341,835.98 |
| Rank 5of 8 | SHLD TEXTURING-EDGELINE RUMBLE STRIPS&PAV MARKINGS | OCHILTREE | 2017-10-03 | $861,790.95 | $810,357.03 |
| Low bidof 7 | RUMBLE STRIPS CENTER AND EDGE LINE | COCHRAN | 2017-08-09 | $1,040,662.59 | $1,040,662.59 |
| Rank 3of 7 | SPECIALTY MARKINGS | MARTIN | 2017-08-09 | $381,169.00 | $361,435.41 |
| Rank 2of 6 | SPECIALTY MARKINGS | ECTOR | 2017-08-09 | $566,515.40 | $549,273.52 |
| Rank 2of 2 | MOWING HIGHWAY RIGHT OF WAY | HUDSPETH | 2017-07-20 | $65,101.20 | $54,651.00 |
| Low bidof 6 | SPECIALTY MARKINGS | PECOS | 2017-07-18 | $190,971.50 | $190,971.50 |
| Rank 2of 5 | HIGH PERFORMANCE STRIPING | TAYLOR | 2017-07-18 | $289,100.00 | $230,803.00 |
| Rank 2of 5 | INSTALLATION OF PVT MRKGS AND PVT MRKRS | WEBB | 2017-07-13 | $301,367.20 | $266,387.04 |
| Rank 3of 7 | CENTERLINE AND SHOULDER TEXTURING | RUNNELS | 2017-07-11 | $2,595,121.27 | $2,069,426.76 |
| Rank 4of 6 | ONCALL STRIPING & RPM | WICHITA | 2017-07-11 | $1,119,660.00 | $1,010,918.00 |
| Rank 2of 2 | STREET SWEEPING | ECTOR | 2017-04-18 | $347,470.62 | $270,034.53 |
| Low bidof 3 | RE-ERECTING LARGE SIGNS (CALL OUT) | PECOS | 2017-04-11 | $271,265.00 | $271,265.00 |
| Rank 2of 3 | RE-ERECTING LARGE SIGNS(CALLOUT) | ECTOR | 2017-04-11 | $348,715.00 | $348,000.00 |
| Rank 2of 8 | STRIPING_(CALLOUT) | ECTOR | 2017-04-05 | $390,054.00 | $325,900.00 |
| Rank 3of 7 | CENTERLINE TEXTURING | ARCHER | 2017-04-04 | $316,391.59 | $273,290.91 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.