Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
364 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 7 | RESURFACE ROADWAY | WISE | 2020-06-05 | $839,666.85 | $808,032.39 |
| Rank 7of 8 | ADD RAISED MEDIAN LEFT & RIGHT TURN LN & RESTRIPE | DENTON | 2020-06-04 | $26,422,349.01 | $21,269,536.66 |
| Rank 2of 8 | RESURFACE ROADWAY | TARRANT | 2020-05-08 | $4,512,369.56 | $4,404,395.36 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIRS | COLLIN | 2020-05-08 | $3,453,529.12 | $2,150,063.50 |
| Rank 3of 6 | RESURFACE ROADWAY | PARKER | 2020-05-07 | $1,061,983.08 | $936,540.03 |
| Rank 4of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2020-05-07 | $972,724.70 | $824,855.00 |
| Rank 5of 5 | DENSE-GRADED_HOT-MIX ASPHALT (MATERIALS ONLY) | PARKER | 2020-05-07 | $515,000.00 | $399,050.00 |
| Rank 3of 3 | HOT MIX (MATERIALS ONLY) | MONTAGUE | 2020-04-23 | $243,900.00 | $204,165.00 |
| Low bidof 4 | OVERLAY SH 289 | GRAYSON | 2020-04-09 | $2,219,130.06 | $2,219,130.06 |
| Rank 5of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | COLLIN | 2020-04-08 | $4,658,854.92 | $3,089,622.75 |
| Rank 5of 6 | SAFETY TREAT FIXED OBJECTS | COOKE | 2020-04-08 | $230,527.65 | $159,018.00 |
| Low bidof 7 | PAVEMENT REPAIR AND OVERLAY | CLAY | 2020-03-05 | $1,945,126.66 | $1,945,126.66 |
| Low bidof 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | MONTAGUE | 2020-03-05 | $3,163,722.22 | $3,163,722.22 |
| Rank 2of 2 | MILL & OVERLAY, PAVEMENT REPAIR AND MARKINGS | DENTON | 2020-03-05 | $6,696,810.58 | $5,910,402.34 |
| Rank 9of 9 | FULL DEPTH CONCRETE REPAIRS AND PAVEMENT MARKINGS | DENTON | 2020-03-04 | $1,860,584.13 | $997,920.80 |
| Low bidof 3 | RESURFACE ROADWAY | WISE | 2020-02-06 | $1,052,231.59 | $1,052,231.59 |
| Low bidof 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | CLAY | 2020-02-06 | $4,202,296.72 | $4,202,296.72 |
| Rank 2of 6 | FLEXIBLE PAVEMENT REPAIR | WISE | 2020-01-10 | $3,366,472.84 | $3,360,528.52 |
| Rank 2of 6 | BASE REPAIR, MILL, OVERLAY | DENTON | 2019-10-03 | $1,561,622.33 | $1,435,083.86 |
| Rank 2of 6 | FULL DEPTH CONCRETE REPAIR | DENTON | 2019-10-02 | $1,652,424.69 | $1,486,329.30 |
| Low bidof 4 | RESURFACE ROADWAY | TARRANT | 2019-08-07 | $3,540,605.35 | $3,540,605.35 |
| Low bidof 5 | PREVENTATIVE MAINTENANCE | TARRANT | 2019-08-06 | $6,436,651.58 | $6,436,651.58 |
| Rank 7of 7 | WIDEN SHLDRS & REPLACE BR RAIL & APPROACH RAILING | COLLIN | 2019-06-05 | $22,814,923.87 | $15,143,487.86 |
| Rank 2of 3 | SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS | MONTAGUE | 2019-06-05 | $5,124,362.80 | $4,677,007.22 |
| Rank 4of 4 | FULL DEPTH CONCRETE REPAIR | DENTON | 2019-06-05 | $1,297,334.00 | $626,903.20 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.