Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
52 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 9 | WIDEN FROM 2 TO 4 LANES | MONTGOMERY | 2019-05-08 | $44,957,418.31 | $36,793,630.18 |
| Rank 11of 12 | WDN, GR, STRS, SURF | HILL | 2019-05-07 | $152,464,203.76 | $133,117,085.97 |
| Rank 4of 5 | WDN, GR, STRS, & SURF | MCLENNAN | 2018-12-05 | $463,689,446.76 | $447,614,999.99 |
| Rank 3of 5 | RECON ML,FR & CONST OVERPASS AT CAMBRIDGE | HARRIS | 2018-09-06 | $135,950,552.11 | $116,922,668.26 |
| Rank 5of 5 | PVT,GRDING,STRS,BASE,SIGNING,ITS | AUSTIN | 2018-08-08 | $346,686,800.41 | $317,508,658.52 |
| Rank 8of 9 | GRADING, STRUCTURES, PAVEMENT & STR | TARRANT | 2018-08-07 | $55,784,580.34 | $48,586,586.00 |
| Rank 3of 9 | WIDEN 2 TO 6 LANE DIVIDED & REPLACE RR STR | DENTON | 2018-07-10 | $45,187,736.15 | $43,621,757.47 |
| Rank 4of 4 | RECONSTRUCT CLINTON DRIVE | HARRIS | 2018-07-10 | $30,312,389.90 | $24,159,580.67 |
| Rank 10of 10 | CONSTRUCT 0/4 LN FRTG RDS AND RAMP MODIFICATIONS | DALLAS | 2018-06-06 | $45,888,411.13 | $37,840,877.84 |
| Rank 2of 6 | GR, STRS, BASE & PAVEMENT | GALVESTON | 2018-06-05 | $244,938,856.58 | $230,477,520.47 |
| Rank 4of 5 | WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES | HARRIS | 2018-05-02 | $239,779,521.21 | $201,835,272.64 |
| Rank 9of 11 | WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED | ELLIS | 2018-05-01 | $37,597,640.59 | $32,207,126.84 |
| Rank 11of 11 | CONSTRUCT_GRADE SEPARATION | MONTGOMERY | 2018-04-03 | $30,230,814.39 | $23,483,270.27 |
| Rank 3of 7 | WIDEN & RECONSTRUCT 6 TO 8 LANES | TARRANT | 2018-02-01 | $60,201,383.83 | $53,390,999.88 |
| Rank 5of 11 | GR,DR,BS,STR,PAV,ITS,SGNL,ILLUM & SGN | TARRANT | 2017-12-05 | $184,408,640.07 | $173,724,094.66 |
| Rank 8of 11 | WIDEN TO 4-LN & CONSTR RR GR SEPARATION | FORT BEND | 2017-10-04 | $38,617,525.12 | $34,567,384.20 |
| Rank 4of 5 | WIDEN FREEWAY (SIX LANES) | WALKER | 2017-08-09 | $135,487,788.33 | $122,051,472.89 |
| Rank 7of 9 | GR, STRS & SURF | HARRIS | 2017-08-08 | $21,767,635.24 | $17,962,352.16 |
| Rank 7of 7 | WIDEN 2 LANE RURAL ROADWAY TO 6 LANES DIVIDED URBA | DENTON | 2017-07-11 | $44,866,097.19 | $37,641,150.13 |
| Rank 3of 5 | CONST 1 MORE ML EACH DIRECTION AND REPLACE BRIDGES | WALLER | 2017-06-07 | $146,660,739.22 | $141,496,478.10 |
| Low bidof 3 | RAILROAD REHABILITATION | IRION | 2017-06-07 | $5,357,270.94 | $5,357,270.94 |
| Low bidof 5 | CNST 0 TO 3/4 CD, RCNST 1/3 SBFR, RAMP MOD OP IMP | DALLAS | 2017-06-06 | $109,686,038.50 | $109,686,038.50 |
| Rank 4of 7 | CONSTRUCTION OF FRONTAGE ROADS | DALLAS | 2017-06-06 | $59,191,483.07 | $54,241,512.22 |
| Rank 5of 7 | GR, DRAINAGE, PVMT, STR, SIGNS | ELLIS | 2017-01-04 | $72,493,738.48 | $63,971,599.94 |
| Rank 8of 12 | REPLACE RAILROAD UNDERPASS | FORT BEND | 2017-01-04 | $20,174,952.53 | $18,405,188.99 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.