Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
228 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 3 | SUPER 2 | KNOX | 2019-04-03 | $11,326,430.73 | $11,182,988.22 |
| Rank 2of 2 | OVERLAY | ARCHER | 2019-04-03 | $8,563,184.93 | $7,554,037.74 |
| Rank 3of 5 | OVERLAY | ROBERTS | 2019-04-02 | $24,994,329.67 | $23,349,233.82 |
| Rank 2of 4 | SUPER 2 | WHEELER | 2019-04-02 | $10,112,947.95 | $9,862,939.49 |
| Low bidof 4 | THIN OVERLAY MIX | LYNN | 2019-04-02 | $13,819,500.73 | $13,819,500.73 |
| Low bidof 2 | MILL AND OVERLAY | WILBARGER | 2019-04-02 | $6,884,724.00 | $6,884,724.00 |
| Rank 2of 3 | REHABILITATION OF EXISTING ROADWAY | PARMER | 2019-03-06 | $25,828,264.97 | $25,525,377.94 |
| Rank 2of 4 | REHABILITAION OF EXISTING ROADWAY | HARDEMAN | 2019-03-06 | $4,276,513.31 | $3,994,436.14 |
| Rank 3of 7 | OVERLAY | OCHILTREE | 2019-03-05 | $16,053,019.38 | $13,814,377.45 |
| Rank 3of 3 | SUBGRADE WIDENING, FLXBASE, 2 COURSE | DAWSON | 2019-03-05 | $4,643,863.05 | $4,232,784.05 |
| Rank 2of 3 | MILL,INLAY,FABRIC,SMA,& STRIPING | LUBBOCK | 2019-02-06 | $14,047,183.12 | $13,802,665.94 |
| Rank 2of 3 | ASPHALTIC CONCRETE OVERLAY | DONLEY | 2019-02-06 | $4,795,164.84 | $4,527,707.02 |
| Rank 2of 4 | GRADE, BASE, ACP | LUBBOCK | 2019-02-05 | $23,426,640.75 | $18,836,295.18 |
| Low bidof 2 | REHABILITATION OF EXISTING ROADWAY | FOARD | 2019-01-09 | $4,375,237.33 | $4,375,237.33 |
| Rank 4of 5 | ACP OVERLAY,CRCP REPAIR, MBGF, AND STRIPING. | CARSON | 2019-01-09 | $9,354,408.73 | $8,012,745.35 |
| Rank 2of 5 | LEVEL UP AND OVERLAY | YOUNG | 2019-01-09 | $2,824,886.69 | $2,678,507.13 |
| Rank 2of 2 | MILL AND OVERLAY | WICHITA | 2019-01-08 | $7,358,390.00 | $6,221,093.62 |
| Rank 2of 4 | SMA OVERLAY, MBGF, STRIPING, RUMBLE STRIPS. | POTTER | 2019-01-08 | $7,967,170.83 | $7,778,312.13 |
| Rank 7of 7 | BASE REPAIR LEVEL UP AND OVERLAY | JONES | 2019-01-08 | $9,260,927.57 | $7,597,359.90 |
| Rank 2of 4 | OVERLAY, MILL FILL, CONC BARRIER, ADD TURN LANES. | RANDALL | 2018-12-06 | $11,864,138.75 | $10,708,977.98 |
| Rank 3of 5 | BASE REPAIR AND OVERLAY | OCHILTREE | 2018-11-06 | $14,655,038.79 | $13,090,321.61 |
| Rank 4of 5 | REHABILIATION | FLOYD | 2018-11-06 | $11,042,057.14 | $9,844,109.88 |
| Rank 3of 6 | EBL - FULL DEPTH REPAIR, MILL AND FILL | CARSON | 2018-10-03 | $17,649,383.43 | $16,196,034.33 |
| Low bidof 2 | ASPHALTICE CONCRETE PAVEMENT OVERLAY | DICKENS | 2018-10-03 | $2,969,974.51 | $2,969,974.51 |
| Rank 3of 5 | OVERLAY | GRAY | 2018-10-02 | $17,366,162.04 | $16,401,396.63 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.