Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
437 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 8 | TREE TRIMMING AND BRUSH REMOVAL | TARRANT | 2024-12-03 | $347,661.00 | $241,177.00 |
| Rank 5of 5 | CRACK SEAL | BAYLOR | 2024-11-20 | $1,546,521.00 | $1,232,489.94 |
| Rank 4of 5 | TREE REMOVAL | POLK | 2024-11-20 | $324,250.00 | $152,400.00 |
| Rank 4of 5 | CRACK SEAL | KIMBLE | 2024-11-19 | $963,479.96 | $737,490.43 |
| Rank 6of 8 | CONCRETE STRUCTURE REPAIR | KLEBERG | 2024-11-19 | $482,354.00 | $296,578.00 |
| Rank 2of 4 | MOWING HIGHWAY RIGHT OF WAY | DENTON | 2024-11-13 | $486,975.00 | $482,476.00 |
| Rank 8of 8 | REMOVAL AND DISPOSAL OF DRIFTWOOD | ELLIS | 2024-11-13 | $583,262.00 | $225,042.00 |
| Low bidof 7 | MOWING HIGHWAY RIGHT OF WAY | DENTON | 2024-11-13 | $190,368.00 | $190,368.00 |
| Rank 4of 6 | TREE TRIMMING AND BRUSH REMOVAL | ELLIS | 2024-11-13 | $344,670.00 | $225,950.00 |
| Rank 10of 12 | TREE TRIMMING AND BRUSH REMOVAL | DENTON | 2024-11-13 | $212,373.00 | $150,125.00 |
| Rank 7of 11 | BRIDGE JOINT CLEANING AND SEALING | ORANGE | 2024-11-13 | $261,911.00 | $212,039.00 |
| Rank 6of 6 | CULVERT REPLACEMENT | WALKER | 2024-11-12 | $922,600.00 | $283,536.00 |
| Rank 3of 4 | BRIDGE PREVENTATIVE MAINTENANCE | WEBB | 2024-11-12 | $1,427,430.00 | $964,255.00 |
| Rank 4of 7 | BRIDGE MAINTENANCE | JOHNSON | 2024-11-06 | $2,834,467.00 | $2,082,914.00 |
| Rank 2of 11 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | STEPHENS | 2024-11-06 | $542,534.40 | $501,898.98 |
| Rank 2of 3 | MOWING HIGHWAY RIGHT OF WAY | DIMMIT | 2024-10-10 | $545,680.00 | $455,979.28 |
| Rank 5of 7 | BRIDGE PREVENTATIVE MAINTENANCE | COLLIN | 2024-10-09 | $85,280.00 | $50,101.00 |
| Rank 3of 4 | CRACK SEAL | CHILDRESS | 2024-10-08 | $1,234,700.00 | $867,300.00 |
| Rank 7of 7 | BRIDGE PREVENTATIVE MAINTENANCE | DONLEY | 2024-10-08 | $1,123,400.00 | $724,905.60 |
| Low bidof 7 | BRIDGE PREVENTATIVE MAINTENANCE | LUBBOCK | 2024-10-03 | $922,390.00 | $922,390.00 |
| Low bidof 9 | BRIDGE MAINTENANCE | COLEMAN | 2024-10-01 | $2,768,114.50 | $2,768,114.50 |
| Rank 3of 12 | BRIDGE SCOUR REPAIR | DALLAS | 2024-10-01 | $1,845,106.40 | $1,712,318.00 |
| Rank 4of 4 | CULVERT REPAIR | JASPER | 2024-09-25 | $1,019,801.00 | $579,509.10 |
| Rank 5of 7 | BRIDGE JOINT CLEANING AND SEALING | HENDERSON | 2024-09-17 | $515,870.00 | $460,630.00 |
| Rank 4of 5 | BRIDGE PREVENTATIVE MAINTENANCE | TRAVIS | 2024-09-11 | $360,945.00 | $216,995.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.