Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
437 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 8 | BRIDGE REPLACEMENT | WILLIAMSON | 2024-02-01 | $203,116.00 | $125,524.00 |
| Low bidof 4 | MOWING HIGHWAY RIGHT OF WAY | BASTROP | 2024-02-01 | $439,334.00 | $439,334.00 |
| Rank 2of 3 | CULVERT REPAIR | LUBBOCK | 2024-02-01 | $261,798.96 | $258,006.80 |
| Rank 3of 5 | BRIDGE MAINTENANCE | CHILDRESS | 2024-01-05 | $1,806,599.00 | $1,520,757.50 |
| Rank 8of 8 | TREE REMOVAL | GRAY | 2024-01-05 | $795,653.00 | $459,000.64 |
| Low bidof 3 | MISCELLANEOUS CONCRETE REPAIR | PECOS | 2024-01-05 | $525,713.60 | $525,713.60 |
| Rank 2of 4 | MOWING HIGHWAY RIGHT OF WAY | FRIO | 2024-01-05 | $812,560.00 | $805,476.80 |
| Low bidof 4 | DRAINAGE IMPROVEMENT AND/OR REPAIRS | KLEBERG | 2024-01-04 | $699,900.00 | $699,900.00 |
| Rank 3of 4 | MOWING HIGHWAY RIGHT OF WAY | ATASCOSA | 2024-01-04 | $823,113.00 | $716,883.50 |
| Rank 6of 6 | EROSION REPAIR | ATASCOSA | 2023-12-13 | $262,880.00 | $148,725.00 |
| Rank 3of 5 | CONCRETE SPALL REPAIR | MEDINA | 2023-12-13 | $89,580.00 | $72,975.00 |
| Low bidof 2 | TREE REMOVAL | BRAZOS | 2023-12-13 | $395,100.00 | $395,100.00 |
| Low bidof 2 | TREE REMOVAL | ROBERTSON | 2023-12-13 | $390,700.00 | $390,700.00 |
| Rank 3of 6 | BRIDGE REPAIR | LUBBOCK | 2023-12-06 | $1,482,086.00 | $1,197,424.00 |
| Rank 7of 12 | BRIDGE PREVENTATIVE MAINTENANCE | HALL | 2023-12-05 | $624,004.00 | $421,800.00 |
| Rank 2of 6 | CONCRETE STRUCTURE REPAIR | KARNES | 2023-12-05 | $659,520.00 | $487,310.00 |
| Rank 5of 8 | METAL BEAM GUARD FENCE UPGRADE | ATASCOSA | 2023-12-05 | $884,179.40 | $649,999.00 |
| Low bidof 7 | BRIDGE MAINTENANCE | LUBBOCK | 2023-11-02 | $1,420,057.00 | $1,420,057.00 |
| Low bidof 6 | BRIDGE REPLACEMENT | FISHER | 2023-11-02 | $684,071.00 | $684,071.00 |
| Rank 7of 11 | BRIDGE PREVENTATIVE MAINTENANCE | BOWIE | 2023-11-02 | $701,768.00 | $549,785.00 |
| Rank 5of 8 | BRIDGE PREVENTATIVE MAINTENANCE | POLK | 2023-11-02 | $443,529.00 | $330,272.00 |
| Rank 3of 9 | BRIDGE PREVENTATIVE MAINTENANCE | VAN ZANDT | 2023-11-02 | $826,409.49 | $739,192.55 |
| Rank 5of 6 | CULVERT CLEANING | TAYLOR | 2023-11-01 | $1,037,715.00 | $710,250.00 |
| Rank 2of 8 | BRIDGE PREVENTATIVE MAINTENANCE | LEON | 2023-11-01 | $511,282.00 | $442,895.00 |
| Rank 5of 11 | BRIDGE SCOUR REPAIR | DALLAS | 2023-11-01 | $812,321.00 | $668,958.65 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.