Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
437 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 8 | HAZARD ELIMINATION & SAFETY | GREGG | 2023-08-03 | $297,142.00 | $225,254.70 |
| Rank 2of 9 | BRIDGE PREVENTATIVE MAINTENANCE | TAYLOR | 2023-08-03 | $899,995.00 | $850,490.00 |
| Low bidof 4 | FULL DEPTH CONCRETE REPAIR | JEFFERSON | 2023-08-03 | $886,093.00 | $886,093.00 |
| Rank 4of 6 | ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDE | GREGG | 2023-08-02 | $134,195.00 | $90,510.00 |
| Rank 2of 3 | MOWING HIGHWAY RIGHT OF WAY | BLANCO | 2023-08-02 | $286,728.00 | $273,559.28 |
| Rank 2of 4 | EROSION REPAIR | ORANGE | 2023-08-02 | $523,097.00 | $492,945.00 |
| Rank 7of 7 | BRIDGE PREVENTATIVE MAINTENANCE | MCCULLOCH | 2023-08-02 | $1,555,549.00 | $731,337.50 |
| Rank 4of 5 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2023-08-02 | $341,504.00 | $296,740.00 |
| Rank 2of 3 | BRIDGE REPAIR | REEVES | 2023-08-02 | $964,750.00 | $741,125.00 |
| Rank 3of 5 | CRACK SEAL OF ASPHALT PAVEMENT | HAYS | 2020-08-11 | $289,635.57 | $226,560.51 |
| Rank 3of 8 | UPGRADE GUARDRAIL | COOKE | 2020-08-06 | $1,294,834.05 | $1,193,935.09 |
| Rank 2of 6 | REPLACE GUARDRAIL | SMITH | 2020-08-06 | $851,155.60 | $833,358.00 |
| Rank 5of 8 | UPGRADE GUARDRAIL | ARCHER | 2020-08-05 | $752,379.75 | $590,517.60 |
| Low bidof 2 | CRACK SEALING OF ASPHALT PAVEMENT | WILLIAMSON | 2020-08-05 | $580,036.36 | $580,036.36 |
| Rank 2of 3 | CLEAN & SEAL JOINT AND/OR CRACK ASPHALT | DALLAS | 2020-08-05 | $542,186.00 | $364,479.47 |
| Rank 3of 3 | CRACK SEAL (RUBBER ASPHALT) | BROWN | 2020-08-05 | $496,827.04 | $363,473.28 |
| Rank 3of 4 | METAL BEAM GUARD FENCE REPAIR | WASHINGTON | 2020-08-05 | $959,050.00 | $633,895.00 |
| Rank 2of 2 | CRACK SEAL | HILL | 2020-08-05 | $572,340.30 | $515,051.22 |
| Rank 3of 5 | HAZARD ELIMINATION & SAFETY | TARRANT | 2020-07-09 | $480,879.00 | $466,497.15 |
| Rank 2of 2 | CRACKSEAL_PROJECT | KIMBLE | 2020-07-09 | $446,072.97 | $342,668.21 |
| Rank 5of 5 | TREE TRIM, BRUSH, DRIFTWOOD & DEBRIS REM | MCLENNAN | 2020-07-09 | $664,404.30 | $206,652.75 |
| Rank 2of 9 | BRIDGE PREVENTIVE MAINTENANCE | WICHITA | 2020-07-09 | $948,415.00 | $903,670.00 |
| Rank 2of 5 | RUBBER ASPHALT CRACKSEALING | ORANGE | 2020-06-05 | $342,589.26 | $320,955.79 |
| Rank 4of 4 | CLEANING & CRACK SEALING OF HIGHWAYS | VAL VERDE | 2020-06-05 | $348,200.00 | $252,430.00 |
| Rank 4of 4 | CLEANING & CRACK SEALING OF HIGHWAYS | WEBB | 2020-06-05 | $348,200.00 | $252,680.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.