Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
436 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 8 | KingsvilleInterschool&Resd.Multi.Connect | KLEBERG | 2026-05-07 | $1,392,339.18 | $1,171,488.51 |
| Rank 4of 6 | BR | Old Robinson Rd @ Drain | MCLENNAN | 2026-05-07 | $839,991.82 | $578,157.81 |
| Rank 4of 4 | Price Rd. - Traffic Signal Improvements | CAMERON | 2026-05-07 | $910,157.31 | $750,892.98 |
| Rank 13of 17 | FM 1107; 1271-01-013; BR | WILSON | 2026-05-07 | $1,382,348.10 | $948,874.50 |
| Rank 4of 8 | Dallas District-Wide ADA Projects FY2026 | DALLAS | 2026-05-07 | $3,068,079.18 | $2,678,695.00 |
| Rank 4of 6 | 2025_AUS_Williamson County | WILLIAMSON | 2026-05-07 | $467,478.85 | $379,121.00 |
| Rank 8of 8 | SH 29 from RM 1174 to WILLIAMSON CO LINE | BURNET | 2026-05-06 | $14,697,351.35 | $10,910,071.81 |
| Rank 5of 10 | FM 3090/Blackshear St. - TASA | GRIMES | 2026-05-06 | $2,462,384.20 | $1,828,629.00 |
| Rank 4of 5 | SH20 SAFETY (LEISURE | LAZY KNEE) | EL PASO | 2026-05-06 | $1,078,237.85 | $867,336.25 |
| Rank 4of 5 | FM907_1 | HIDALGO | 2026-05-06 | $2,491,817.87 | $1,927,530.53 |
| Rank 11of 11 | Leopard Drive Shared Use Path and Pedest | BOWIE | 2026-05-06 | $1,438,797.75 | $942,425.98 |
| Rank 4of 13 | US 83 SB @ Salt Fork of Red River | COLLINGSWORTH | 2026-05-06 | $2,888,242.20 | $2,396,525.55 |
| Rank 6of 9 | US 82 Oak Ridge safety lighting | COOKE | 2026-05-06 | $776,299.50 | $664,203.25 |
| Low bidof 7 | IH35E at FM 66 (Rogers St) in Waxahachie | ELLIS | 2026-05-06 | $3,796,555.52 | $3,796,555.52 |
| Low bidof 7 | 6499-60-001 BPM | ECTOR | 2026-04-21 | $521,996.50 | $521,996.50 |
| Rank 3of 8 | Culvert Repair Franklin Co. | FRANKLIN | 2026-04-16 | $145,444.00 | $121,450.00 |
| Rank 2of 5 | 2025 DRAINAGE REPAIR | HARRIS | 2026-04-14 | $233,560.95 | $177,984.05 |
| Rank 2of 5 | Bear Creek and Mayde Creek at HW6 Bridge | HARRIS | 2026-04-14 | $459,181.00 | $393,900.00 |
| Rank 3of 10 | 6499-65-001 BPM | LIVE OAK | 2026-04-14 | $670,050.00 | $639,738.26 |
| Rank 4of 4 | FY 26 BAAO SH 71 Mowing | BASTROP | 2026-04-13 | $515,148.00 | $404,146.00 |
| Rank 5of 7 | FY2026_VA_Bridge Maint - BMN | ANGELINA | 2026-04-08 | $1,137,202.50 | $948,750.00 |
| Low bidof 7 | FM 548 from SH 276 to SH 205 | ROCKWALL | 2026-04-08 | $3,381,745.21 | $3,381,745.21 |
| Rank 7of 12 | FUA erosion Repair 26 | LAMAR | 2026-04-08 | $984,245.00 | $734,734.00 |
| Rank 6of 6 | FM 76 CURB RAMP/ADA IMPROVE (FY 2026) | EL PASO | 2026-04-08 | $1,737,742.00 | $1,248,951.33 |
| Rank 3of 7 | Flexible Pvmt. Structure Repair 09 0326 | ELLIS | 2026-04-08 | $1,218,425.08 | $1,143,763.90 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.