Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
436 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 12 | FY26 Supplemental BPM | CHILDRESS | 2025-12-05 | $661,172.00 | $554,446.00 |
| Rank 11of 12 | BS 71E SIDEWALKS 2709 | FAYETTE | 2025-12-03 | $5,449,794.00 | $4,027,354.50 |
| Rank 6of 7 | US 183 at Clear Fork Brazos River | STEPHENS | 2025-12-03 | $1,508,473.00 | $1,341,645.00 |
| Rank 7of 7 | FY2026 FM2252 AT DRAIN | BEXAR | 2025-11-12 | $118,351.00 | $50,807.00 |
| Rank 6of 6 | FY26 US 87 AT GUNN BRANCH | WILSON | 2025-11-12 | $186,752.00 | $90,862.00 |
| Rank 4of 6 | BPM SH 78 Erosion Control 07 11.25 | COLLIN | 2025-11-12 | $243,742.00 | $216,855.00 |
| Rank 3of 15 | BPM - US175 @ Prairie Creek 03 1025 | DALLAS | 2025-10-08 | $1,351,080.00 | $994,560.00 |
| Rank 3of 9 | 2025-09 Clean and Seal Joints | SHELBY | 2025-09-24 | $685,880.00 | $589,785.00 |
| Rank 7of 8 | Erosion Repair FY 2026 #1 | DE WITT | 2025-09-23 | $645,615.00 | $305,712.41 |
| Rank 4of 4 | Crack Seal-GAO FY26 | HUNT | 2025-09-18 | $521,576.00 | $289,673.25 |
| Rank 4of 4 | Crack Seal-PAO FY26 | RED RIVER | 2025-09-18 | $654,260.00 | $400,320.28 |
| Rank 2of 2 | Crack Seal-SAO FY26 | GRAYSON | 2025-09-18 | $942,702.00 | $839,451.00 |
| Rank 4of 4 | Crack Seal-SSAO FY26 | HOPKINS | 2025-09-18 | $429,500.00 | $163,396.56 |
| Rank 6of 7 | 2025-09 SAN AUG Culvert Repair(District) | SAN AUGUSTINE | 2025-09-17 | $797,209.00 | $617,373.14 |
| Rank 3of 6 | 6487-85-001 Bridge Preventative Maint. | NUECES | 2025-09-16 | $364,013.00 | $276,452.00 |
| Rank 4of 4 | FY26 Brownfield Crack Seal | TERRY | 2025-09-09 | $1,225,267.00 | $730,462.28 |
| Rank 4of 5 | FY26 Littlefield and Lubbock Crack Seal | PARMER | 2025-09-09 | $854,251.00 | $464,211.16 |
| Rank 4of 4 | FY26 Plainview Crack Seal | HALE | 2025-09-09 | $1,326,939.00 | $818,688.91 |
| Low bidof 8 | US 87 SIDEWALKS 2609 | VICTORIA | 2025-09-05 | $3,607,164.00 | $3,607,164.00 |
| Rank 6of 8 | 0069-02-035 US 87 SB @ Cannibal Draw | GLASSCOCK | 2025-09-05 | $3,479,991.50 | $2,242,482.25 |
| Rank 3of 3 | FY 26 Crackseal Amarillo District | POTTER | 2025-09-05 | $2,869,999.00 | $1,963,566.30 |
| Rank 8of 11 | MISCELLANEOUS BRIDGE REPAIR (BPM 2026) | COMANCHE | 2025-09-05 | $1,014,665.00 | $684,585.50 |
| Rank 2of 5 | FY26 BPM | CAMERON | 2025-09-04 | $585,214.00 | $487,387.00 |
| Rank 10of 10 | SH 214-NBI051850046106005-Parmer | PARMER | 2025-09-04 | $7,351,760.00 | $4,197,908.00 |
| Low bidof 2 | FY26 Crack Seal, N. Tarrant | TARRANT | 2025-08-21 | $286,674.60 | $286,674.60 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.