Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
436 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 7 | FY27 Culvert Repair - Anderson Co | ANDERSON | 2026-10-13 | $505,216.50 | $505,216.50 |
| Rank 5of 7 | FY2026 - BPM Jack & Wise Counties | WISE | 2026-10-07 | $2,003,541.63 | $1,040,614.79 |
| Rank 6of 9 | MISC. BRIDGE REPAIR (BPM 2027) | LAMPASAS | 2026-10-07 | $1,013,499.30 | $719,494.00 |
| Rank 4of 10 | FM 486 Downtown Streetscape - TASA | MILAM | 2026-10-06 | $293,044.59 | $257,449.73 |
| Rank 6of 11 | MISCELLANEOUS BRIDGE REPAIR (BPM 2027) | COMANCHE | 2026-10-06 | $1,217,844.96 | $727,661.05 |
| Rank 8of 11 | FY 2027 Guardrail | PARKER | 2026-09-02 | $4,625,522.25 | $3,643,030.50 |
| Rank 7of 7 | Flexible Pavement Repair Denton CO FY 26 | DENTON | 2026-08-12 | $837,902.86 | $662,133.21 |
| Rank 6of 6 | Flexible Pavement 2933 08.2026 | COLLIN | 2026-08-12 | $669,698.69 | $501,226.67 |
| Rank 5of 9 | IH 45 from N of CR 4742 to S of CR 4744 | NAVARRO | 2026-08-06 | $539,852.00 | $480,955.00 |
| Rank 7of 8 | IH 35W; N of Woodbine Dr to S of CR 530B | JOHNSON | 2026-08-05 | $3,468,525.74 | $2,800,123.52 |
| Rank 8of 9 | Collins Blvd From Campbell Rd to Alma Rd | DALLAS | 2026-08-05 | $2,971,781.71 | $2,618,604.00 |
| Rank 2of 3 | Districtwide Upgrade Rail 2027 | WEBB | 2026-08-05 | $2,128,339.95 | $2,041,432.14 |
| Rank 4of 10 | US 80 at Big Brushy Creek | KAUFMAN | 2026-08-05 | $1,075,319.55 | $799,617.05 |
| Rank 7of 8 | 2026-07 Angelina Clean and Seal Joints | ANGELINA | 2026-07-22 | $376,303.20 | $225,584.20 |
| Low bidof 4 | FY27 BPM - Site Specific - West | ANDERSON | 2026-07-21 | $411,596.60 | $411,596.60 |
| Rank 2of 5 | FY 27 BPM Site Specific Central | SMITH | 2026-07-21 | $665,271.20 | $553,299.00 |
| Rank 6of 8 | IH 10 at Wayside Dr and McCarty St | HARRIS | 2026-07-14 | $747,391.40 | $488,125.00 |
| Rank 2of 4 | FY27 - Grimes Co BPM - 07 | GRIMES | 2026-07-14 | $489,204.50 | $487,782.00 |
| Rank 3of 4 | FY 26 Flex Pave Repair | ROCKWALL | 2026-07-08 | $1,645,066.73 | $1,174,731.82 |
| Rank 2of 9 | BPM Debris Removal FY 26 | WHARTON | 2026-07-08 | $183,604.20 | $152,900.00 |
| Rank 7of 9 | Bridge Joint Cleaning & Sealing 07 0726 | COLLIN | 2026-07-08 | $154,551.45 | $99,466.08 |
| Rank 4of 4 | FPSR 07 08.26 | COLLIN | 2026-07-08 | $873,897.54 | $710,405.80 |
| Rank 2of 7 | FM 3438 SHARED USE PATH CARBON REDUCTION | TAYLOR | 2026-07-02 | $291,371.00 | $254,408.38 |
| Low bidof 10 | US 281 SB over SH 79 SB FM 369 Connector | WICHITA | 2026-07-02 | $1,719,201.10 | $1,719,201.10 |
| Rank 5of 10 | Bridge Repair and Maintenance | HARRIS | 2026-07-02 | $1,341,024.80 | $898,477.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.