Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
154 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | FY 26 Guadalupe Bundled Bid | GUADALUPE | 2025-07-02 | $1,741,247.50 | $1,429,483.20 |
| Rank 2of 7 | FY26 Guardrail Repair North Tarrant | TARRANT | 2025-07-01 | $1,660,091.00 | $1,434,062.00 |
| Rank 2of 6 | 2026 ORANGE AREA FDCR | JASPER | 2025-06-17 | $190,602.00 | $150,459.00 |
| Rank 2of 4 | 6484-66-001 MBGF (Callout) | ECTOR | 2025-06-10 | $287,790.00 | $271,110.00 |
| Low bidof 2 | 6484-74-001 Litter Removal | MIDLAND | 2025-06-10 | $209,440.00 | $209,440.00 |
| Rank 6of 9 | FY26 - Walker/Madison Tree Removal | WALKER | 2025-06-10 | $215,300.00 | $175,375.04 |
| Low bidof 2 | 2025-5 Polk MBGF | POLK | 2025-05-21 | $163,555.00 | $163,555.00 |
| Rank 2of 2 | 2025-5 Sabine MBGF | SABINE | 2025-05-21 | $134,380.00 | $103,435.00 |
| Rank 3of 3 | 2025-05 San Jacinto Traffic Control | SAN JACINTO | 2025-05-21 | $1,516,200.00 | $1,003,250.00 |
| Rank 2of 2 | FY25 Districtwide Small Sign Maint. | TRAVIS | 2025-05-14 | $171,022.00 | $146,974.00 |
| Rank 3of 10 | FY25 - Smith County Tree Removal | SMITH | 2025-05-13 | $642,708.00 | $596,875.00 |
| Rank 3of 6 | 2025-04 Sabine Tree And Brush Removal | SABINE | 2025-04-30 | $358,880.00 | $300,058.00 |
| Rank 3of 6 | Ditch and Culvert-SSAO 25 | HOPKINS | 2025-04-17 | $122,500.00 | $94,565.00 |
| Low bidof 9 | TREE TRIMMING AND BRUSH REMOVAL 2025 | MILLS | 2025-04-17 | $581,070.00 | $581,070.00 |
| Low bidof 6 | 2025-03 San Jacinto Tree and Brush REM | SAN JACINTO | 2025-04-16 | $104,005.00 | $104,005.00 |
| Rank 4of 6 | 6482-85-001 PALM TREE TRIM AND REMOVAL | HIDALGO | 2025-04-15 | $554,230.00 | $415,049.00 |
| Rank 2of 4 | FY 25 SAAO MBGF Repair | HAYS | 2025-04-04 | $652,490.00 | $535,511.50 |
| Rank 2of 7 | 2025-03 Sabine Tree and Brush Removal | SABINE | 2025-03-19 | $267,040.00 | $259,535.00 |
| Rank 4of 7 | 2025-03 Trinity Tree and Brush Removal | TRINITY | 2025-03-19 | $294,530.00 | $221,945.00 |
| Rank 8of 10 | 2024-11 Houston Tree and Brush Removal | HOUSTON | 2025-02-19 | $286,505.00 | $227,400.00 |
| Rank 5of 8 | 2024-11 Polk Tree And Brush Removal | POLK | 2025-02-19 | $174,505.00 | $131,060.00 |
| Low bidof 2 | FY25 - Washington Tree Removal - 11 | WASHINGTON | 2025-01-21 | $198,575.00 | $198,575.00 |
| Rank 3of 4 | 2024-11 San Jacinto MBGF | SAN JACINTO | 2025-01-15 | $201,882.00 | $143,895.00 |
| Rank 3of 3 | 2024-11 San Augustine MBGF | SAN AUGUSTINE | 2025-01-15 | $168,445.00 | $123,070.00 |
| Low bidof 8 | TREE TRIMMING AND BRUSH REMOVAL | TARRANT | 2024-12-03 | $241,177.00 | $241,177.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.