Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
287 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | VA: 0915-00-279; TCD | BEXAR | 2026-02-04 | $1,752,800.00 | $1,489,271.10 |
| Low bidof 2 | FY 26 Districtwide Illumination RMC | JEFFERSON | 2026-01-13 | $882,505.00 | $882,505.00 |
| Rank 2of 3 | TRAFFIC_SIGNAL_SCR1232_AT_CR120 | MIDLAND | 2026-01-07 | $424,869.25 | $414,647.25 |
| Rank 3of 12 | FY 26-DISTRICT WIDE-OH SIGN REPLACE | JEFFERSON | 2026-01-06 | $255,178.50 | $241,946.88 |
| Rank 6of 7 | US 82 LED Chevrons | KNOX | 2026-01-06 | $294,600.00 | $238,375.00 |
| Low bidof 4 | Illumination Repair | JACKSON | 2025-12-16 | $740,415.00 | $740,415.00 |
| Rank 3of 5 | US84-CR7200 FY26 HSIP | LUBBOCK | 2025-12-03 | $866,547.50 | $695,678.34 |
| Rank 2of 5 | FM8 at FM 219 Intersection | ERATH | 2025-12-03 | $219,380.00 | $156,215.32 |
| Low bidof 7 | SS 371: 0024-09-028: LED Replace | BEXAR | 2025-12-02 | $1,759,160.95 | $1,759,160.95 |
| Rank 4of 7 | Signal Illumination & Camera | BELL | 2025-12-02 | $1,642,505.00 | $1,401,798.23 |
| Low bidof 3 | Illumination Maintenance-FY26 | LAMAR | 2025-11-20 | $488,025.00 | $488,025.00 |
| Rank 2of 9 | IH 30 WBFR Ent Ramp to SL 12 | DALLAS | 2025-11-05 | $1,184,484.00 | $1,127,949.43 |
| Rank 5of 6 | Large Sign Maintenance FY26 | MCLENNAN | 2025-10-23 | $417,250.00 | $310,048.00 |
| Low bidof 5 | Large Guide Sign Repair/Replace IH 10 | FAYETTE | 2025-10-22 | $205,668.40 | $205,668.40 |
| Rank 2of 4 | Illumination-Hopkins Co. | HOPKINS | 2025-10-16 | $349,530.00 | $299,930.00 |
| Rank 7of 9 | Va Robertson County - Back Plates FY 26 | ROBERTSON | 2025-10-09 | $120,375.00 | $71,003.22 |
| Rank 2of 6 | FY2026 - Loop Detector | HARRIS | 2025-10-09 | $1,379,500.00 | $1,127,272.00 |
| Rank 2of 8 | SL 522 TRAFFIC SIGNAL 2511 | JACKSON | 2025-10-08 | $2,052,819.75 | $1,945,236.31 |
| Low bidof 7 | Walnut Creek Dr: Debbie Ln to Saving Pla | TARRANT | 2025-10-08 | $290,075.00 | $290,075.00 |
| Rank 2of 2 | Wichita Falls reflective backplates | WICHITA | 2025-10-08 | $288,750.00 | $253,469.08 |
| Low bidof 1 | FY 2026 Illumination Maintenance | LUBBOCK | 2025-09-16 | $395,450.00 | $395,450.00 |
| Rank 2of 4 | Non SS Signal/Illumination | MCLENNAN | 2025-09-05 | $1,710,575.00 | $1,576,247.00 |
| Low bidof 9 | US 290, FM 529 to IH 610 | HARRIS | 2025-09-05 | $2,447,344.00 | $2,447,344.00 |
| Low bidof 6 | FY2025 - Preventive Mnt of Sgnl Equip | HARRIS | 2025-09-05 | $1,678,290.00 | $1,678,290.00 |
| Rank 8of 8 | HOU_FM 2854, Lone Star Elem-McCaleb | MONTGOMERY | 2025-09-04 | $1,139,845.00 | $636,099.25 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.