Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
46 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 3 | FM 36 Rehab | HUNT | 2025-01-08 | $6,730,503.74 | $6,730,503.74 |
| Rank 3of 4 | SEAL COAT | HOOD | 2024-12-04 | $13,023,999.02 | $9,721,843.05 |
| Low bidof 2 | SEAL COAT | HOPKINS | 2024-12-03 | $14,548,148.96 | $14,548,148.96 |
| Rank 5of 6 | BRIDGE PREVENTATIVE MAINTENANCE | RED RIVER | 2024-11-21 | $445,525.00 | $327,282.00 |
| Rank 2of 3 | SEAL COAT | LUBBOCK | 2024-11-06 | $21,167,752.73 | $20,682,233.92 |
| Rank 6of 6 | REHABILITATE EXISTING ROADWAY | LIMESTONE | 2024-11-06 | $13,035,324.61 | $9,559,736.50 |
| Rank 2of 2 | SEAL COAT | BOWIE | 2024-10-01 | $10,873,336.00 | $10,662,923.12 |
| Rank 3of 4 | SEAL COAT | BRISCOE | 2024-10-01 | $8,924,873.93 | $7,724,031.17 |
| Low bidof 7 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | RED RIVER | 2024-05-02 | $2,554,515.80 | $2,554,515.80 |
| Rank 2of 7 | CROSS DRAINAGE STRUCTURE REPAIR | RED RIVER | 2024-04-04 | $863,610.00 | $853,971.00 |
| Rank 3of 5 | SEAL COAT | SMITH | 2023-12-06 | $22,889,851.02 | $21,313,599.05 |
| Rank 2of 8 | BRIDGE REPLACEMENT | RAINS | 2023-12-06 | $449,885.00 | $424,043.00 |
| Low bidof 3 | PREVENTIVE MAINTENANCE | HUNT | 2023-12-05 | $15,007,962.44 | $15,007,962.44 |
| Rank 4of 10 | BRIDGE REPLACEMENT | NACOGDOCHES | 2023-12-05 | $2,598,720.50 | $2,041,759.25 |
| Rank 4of 5 | PREVENTIVE MAINTENANCE | ERATH | 2023-12-05 | $12,000,778.56 | $11,095,984.14 |
| Rank 10of 12 | BRIDGE PREVENTATIVE MAINTENANCE | HALL | 2023-12-05 | $770,500.00 | $421,800.00 |
| Rank 3of 3 | SEAL COAT | LAMB | 2023-11-02 | $25,168,768.95 | $22,788,746.19 |
| Rank 11of 11 | BRIDGE PREVENTATIVE MAINTENANCE | BOWIE | 2023-11-02 | $952,510.00 | $549,785.00 |
| Rank 3of 6 | SEAL COAT | BRISCOE | 2023-10-06 | $7,674,063.03 | $7,556,670.11 |
| Low bidof 3 | SEAL COAT AND PAVEMENT MARKINGS | BOWIE | 2023-10-05 | $11,823,241.45 | $11,823,241.45 |
| Rank 2of 5 | HAZARD ELIMINATION & SAFETY | LAMAR | 2023-10-05 | $2,888,845.88 | $2,609,125.82 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.