Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
772 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | TOTAL REST AREA MAINTENANCE | CROSBY | 2017-04-05 | $5,842,800.00 | $5,842,800.00 |
| Rank 2of 8 | GR, BS, STRUC, AND PAVEMENT | HOOD | 2017-04-04 | $3,313,969.43 | $3,211,241.96 |
| Rank 8of 9 | REPLACE BRIDGE AND APPROACHES | HOUSTON | 2017-04-04 | $818,940.20 | $619,443.50 |
| Rank 3of 4 | OVERLAY EXISTING ROADWAY | JASPER | 2017-04-04 | $1,253,848.14 | $1,012,112.48 |
| Rank 2of 2 | PROVIDE ADDITIONAL PAVED SURFACE | ORANGE | 2017-04-04 | $392,525.82 | $328,092.65 |
| Low bidof 6 | SCARIFY,FLEX BS,TCST,STRS,PV MK | VAN ZANDT | 2017-04-04 | $2,436,392.26 | $2,436,392.26 |
| Rank 5of 5 | GR,BS,ACP SURF,STRM SWR,C&G,SFTY IMPRV,SIGNS,PM | GREGG | 2017-04-04 | $3,989,943.34 | $3,538,933.21 |
| Low bidof 3 | REHABILITATION OF EXISTING ROADWAY | KAUFMAN | 2017-04-04 | $5,676,173.14 | $5,676,173.14 |
| Low bidof 4 | ROADWAY WIDENING | WOOD | 2017-04-04 | $1,287,284.82 | $1,287,284.82 |
| Rank 4of 11 | REALIGN EXISTING ROADWAY | EASTLAND | 2017-03-08 | $79,922,115.35 | $76,238,256.10 |
| Rank 2of 12 | RESTORATION | CALLAHAN | 2017-03-08 | $1,916,899.56 | $1,793,913.92 |
| Rank 3of 6 | SPOT BASE REPAIR | ROBERTSON | 2017-03-08 | $737,137.50 | $657,725.00 |
| Low bidof 6 | RECONSTRUCT EXISTING PAVEMENT, ETC. | TRINITY | 2017-03-07 | $1,947,390.02 | $1,947,390.02 |
| Rank 5of 9 | FULL DEPTH REPAIR AND OVERLAY | COOKE | 2017-03-07 | $976,312.56 | $793,931.00 |
| Rank 3of 5 | REHABILITATION OF EXISTING ROAD | FANNIN | 2017-03-07 | $3,626,907.60 | $3,303,723.03 |
| Low bidof 5 | BASE REPAIR, CRAC SEAL, HMAC OVERLAY | SMITH | 2017-03-07 | $1,269,696.00 | $1,269,696.00 |
| Rank 4of 6 | SURF TRT, ACP SURF, MBGF, PVMT MRKG | RUSK | 2017-03-07 | $5,584,920.09 | $4,670,549.69 |
| Low bidof 2 | INCREASE SUPERELEVATION | TYLER | 2017-03-07 | $458,347.10 | $458,347.10 |
| Low bidof 8 | EXTEND CULVERTS | YOUNG | 2017-03-07 | $2,333,357.95 | $2,333,357.95 |
| Low bidof 4 | REHABILITATE EXISTING ROADWAY | JASPER | 2017-03-07 | $538,722.70 | $538,722.70 |
| Rank 2of 7 | TOTAL REST AREA MAINTENANCE | NOLAN | 2017-03-07 | $5,558,400.00 | $5,496,617.88 |
| Low bidof 6 | RECONSTRUCT ROADS AND CAMPSITES | FREESTONE | 2017-02-03 | $1,862,429.04 | $1,862,429.04 |
| Rank 2of 5 | BASE REPAIR,LEVEL UP,OVERLAY | KAUFMAN | 2017-02-03 | $4,427,515.20 | $4,016,437.41 |
| Rank 2of 5 | RECONSTRUCT AND WIDEN PAVEMENT | HOUSTON | 2017-02-02 | $3,242,867.68 | $3,134,729.03 |
| Rank 4of 6 | IMPRV GR, SFT TREAT FIXED, ADD PASS | MILLS | 2017-01-05 | $2,113,193.76 | $1,557,630.87 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.