Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
642 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 8 | INSTALL CABLE BARRIERS | DALLAS | 2020-07-08 | $5,196,964.98 | $4,220,769.77 |
| Rank 2of 5 | INSTALL CABLE BARRIER | BROOKS | 2020-07-08 | $7,143,493.47 | $6,056,599.75 |
| Rank 3of 4 | SAFETY TREAT FIXED OBJECTS | KIMBLE | 2020-06-05 | $4,841,944.15 | $4,234,053.38 |
| Rank 3of 3 | MEDIAN CABLE BARRIER REPAIR | MIDLAND | 2020-06-05 | $431,960.00 | $301,950.00 |
| Rank 2of 3 | BRIDGE MAINTENANCE | HIDALGO | 2020-06-04 | $335,917.00 | $325,600.00 |
| Rank 4of 5 | BRIDGE REPAIR | REEVES | 2020-06-04 | $859,787.00 | $831,572.20 |
| Rank 2of 8 | MISC BRIDGE REPAIR | GONZALES | 2020-05-08 | $2,899,670.71 | $2,603,773.74 |
| Rank 8of 9 | BPM | EL PASO | 2020-05-08 | $687,543.00 | $485,854.80 |
| Rank 3of 5 | INSTALL CABLE MEDIAN BARRIER | POTTER | 2020-05-07 | $4,508,233.40 | $3,940,370.90 |
| Rank 7of 10 | FY 2020 BRIDGE MAINTENANCE (EL PASO COUNTY) | EL PASO | 2020-05-07 | $4,092,847.50 | $2,570,503.40 |
| Rank 5of 7 | IMPROVE GUARDRAIL TO DESIGN STANDARD,ETC. | WHARTON | 2020-05-07 | $2,351,464.30 | $1,842,177.41 |
| Rank 7of 9 | BRIDGE PREVENTIVE MAINTENANCE | GARZA | 2020-05-07 | $869,887.00 | $517,184.80 |
| Rank 3of 3 | BRIDGE MAINTENANCE | CAMERON | 2020-04-09 | $15,145,679.00 | $9,814,198.00 |
| Low bidof 3 | INSTALL CABLE BARRIERS IN MEDIANS | LUBBOCK | 2020-04-09 | $6,065,949.86 | $6,065,949.86 |
| Rank 2of 4 | INSTALL MEDIAN BARRIER | LUBBOCK | 2020-04-09 | $2,051,444.05 | $1,940,614.00 |
| Rank 6of 8 | INSTALLING MEDIAN CABLE BARRIER | REFUGIO | 2020-04-09 | $918,557.86 | $701,474.57 |
| Low bidof 5 | CALLOUT BRIDGE REPAIR | ECTOR | 2020-04-09 | $490,575.00 | $490,575.00 |
| Rank 2of 6 | BRIDGE REPAIR (CALLOUT) | PECOS | 2020-04-09 | $490,575.00 | $429,900.00 |
| Rank 6of 7 | UPGRADE BRIDGE AND APPROACH RAILING | WICHITA | 2020-04-08 | $1,273,014.80 | $948,263.90 |
| Rank 3of 5 | FERRY LANDING GRATING PANEL SYSTEM | NUECES | 2020-04-08 | $790,200.00 | $400,545.00 |
| Rank 3of 4 | CENTER CABLE BARRIER | PARKER | 2020-03-05 | $9,241,629.50 | $7,498,891.35 |
| Low bidof 6 | MISCELLANEOUS BRIDGE REPAIR | WALLER | 2020-03-04 | $149,525.00 | $149,525.00 |
| Rank 5of 6 | BEARING PAD REPLACEMENT, BRIDGE JOINT REPAIR, MISC | HARRIS | 2020-02-07 | $2,009,149.00 | $1,121,901.00 |
| Rank 5of 8 | BRIDGE PREVENTATIVE MAINTENANCE | WHEELER | 2020-02-07 | $942,289.00 | $697,998.00 |
| Rank 7of 11 | MISCELLANEOUS BRIDGE REPAIR | TAYLOR | 2020-02-06 | $1,121,916.00 | $798,993.99 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.