Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
642 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | 0070-03-062 US 87 CABLE BARRIER | CONCHO | 2026-07-01 | $2,666,941.14 | $2,660,738.00 |
| Rank 5of 8 | Various Bridge Repairs for NHAO | HARRIS | 2026-07-01 | $2,550,577.00 | $1,538,016.00 |
| Low bidof 3 | BPM (Seal deck cracks/structure) | CAMERON | 2026-06-25 | $733,936.25 | $733,936.25 |
| Rank 3of 3 | FY26 BPM (Culver, Structural, Bearing) | CAMERON | 2026-06-25 | $660,333.00 | $277,220.00 |
| Rank 4of 7 | BPM Concrete Repairs FY 26 #2 | VICTORIA | 2026-06-10 | $195,155.00 | $182,850.00 |
| Rank 7of 9 | BMN | Bridge Joint Repair Districtwide | MCLENNAN | 2026-06-03 | $4,857,917.71 | $3,058,058.00 |
| Rank 5of 5 | VA: 0915-00-283: BRG Repair District | BEXAR | 2026-06-02 | $7,523,431.00 | $4,555,821.00 |
| Rank 12of 14 | Scour bridges FY 26 Karnes | NUECES | 2026-06-02 | $276,224.00 | $177,547.00 |
| Rank 4of 9 | 0907-00-235 Clean and Seal Bridge Joints | TOM GREEN | 2026-06-02 | $345,760.00 | $306,395.00 |
| Rank 7of 9 | Clean and Seal Joints 04 0526 | DENTON | 2026-05-13 | $369,345.00 | $238,282.00 |
| Rank 2of 4 | SH 36 INSTALL MEDIAN BARRIERS 2605 | AUSTIN | 2026-05-07 | $606,720.44 | $559,612.36 |
| Rank 5of 7 | 6499-60-001 BPM | ECTOR | 2026-04-21 | $776,867.00 | $521,996.50 |
| Low bidof 7 | BPM Grayson FY26 #2 | GRAYSON | 2026-04-16 | $418,850.80 | $418,850.80 |
| Rank 7of 10 | 6499-65-001 BPM | LIVE OAK | 2026-04-14 | $1,202,210.50 | $639,738.26 |
| Rank 8of 11 | 2026 BRIDGE PREVENTATIVE MAINTENANCE | SMITH | 2026-04-07 | $3,910,453.52 | $1,987,427.29 |
| Rank 5of 5 | Bridge Joint Repair - FY 27 | VICTORIA | 2026-04-06 | $1,400,500.00 | $547,152.00 |
| Rank 9of 14 | FY 26 FUA - AUS BR Maint | TRAVIS | 2026-03-05 | $2,109,909.00 | $1,606,502.00 |
| Rank 11of 13 | BAAO/SAAO Bridge FUA Bridge Repairs | TRAVIS | 2026-03-05 | $692,470.00 | $327,386.00 |
| Rank 7of 7 | US 69_FM 1270 to Jasper County Line | ANGELINA | 2026-03-04 | $2,051,818.56 | $1,511,792.00 |
| Rank 6of 7 | CRP_US0181_Bee_HSIP | BEE | 2026-03-04 | $2,527,790.17 | $1,569,681.00 |
| Rank 7of 13 | GTAO/NAAO Bridge FUA Repairs | TRAVIS | 2026-03-04 | $1,113,411.00 | $769,928.00 |
| Rank 2of 10 | FY 2026 Bridge Preventative Maintenance | EL PASO | 2026-03-04 | $1,049,325.00 | $1,025,237.00 |
| Rank 10of 12 | 6494-47-001 BPM | REEVES | 2026-02-24 | $615,706.00 | $393,560.00 |
| Rank 5of 11 | Bridge Preventative Maintenance 09 0226 | ELLIS | 2026-02-11 | $251,154.00 | $205,783.90 |
| Rank 4of 7 | FY26 - SH 19 SB Bridge Repair | WALKER | 2026-02-10 | $85,355.00 | $57,501.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.