Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
642 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | FENDER REPAIRS | CALHOUN | 2019-07-17 | $211,665.00 | $147,105.00 |
| Low bidof 4 | BRIDGE AND RAIL REPAIR | COKE | 2019-07-10 | $419,185.28 | $419,185.28 |
| Rank 2of 5 | BRIDGE JOINT REPAIR | BEXAR | 2019-07-09 | $760,087.10 | $698,380.25 |
| Rank 2of 7 | INSTALL CABLE BARRIER | RUNNELS | 2019-06-05 | $3,530,966.05 | $3,312,755.35 |
| Rank 3of 6 | INSTALL MEDIAN BARRIER | EASTLAND | 2019-06-05 | $1,040,507.70 | $848,830.31 |
| Rank 3of 3 | REPLACE BEARING PADS | HARRIS | 2019-06-05 | $702,260.50 | $578,700.00 |
| Rank 3of 5 | REPLACE BEARING PADS | HARRIS | 2019-06-05 | $1,425,300.00 | $1,045,020.00 |
| Rank 2of 5 | INSTALL MEDIAN BARRIER | FREESTONE | 2019-06-05 | $350,746.55 | $340,990.00 |
| Low bidof 6 | REPLACE GUARDRAIL | TARRANT | 2019-06-04 | $4,081,763.15 | $4,081,763.15 |
| Rank 3of 4 | INSTALL MEDIAN CABLE AND CONCRETE BARRIER | KAUFMAN | 2019-06-04 | $4,511,956.28 | $4,110,939.65 |
| Rank 3of 3 | REPLACE BEARING PADS | HARRIS | 2019-06-04 | $2,319,616.55 | $1,750,062.00 |
| Rank 5of 5 | BRIDGE MAINTENANCE | REEVES | 2019-06-04 | $539,074.00 | $415,240.00 |
| Rank 3of 10 | INSTALL CABLE BARRIERS | NAVARRO | 2019-05-08 | $5,632,835.40 | $4,889,741.00 |
| Rank 2of 2 | 2018 BMIP REPAIR BRIDGE | OLDHAM | 2019-05-08 | $8,415,375.30 | $7,204,392.00 |
| Low bidof 3 | REHABILITATE BRIDGE | TRAVIS | 2019-05-08 | $2,484,393.10 | $2,484,393.10 |
| Low bidof 4 | UPDATE BRIDGE AND APPROACH DETAIL | JASPER | 2019-05-08 | $1,098,472.87 | $1,098,472.87 |
| Rank 2of 4 | BRIDGE RAIL AND BRIDGE REPAIRS | TOM GREEN | 2019-05-08 | $736,807.00 | $682,830.00 |
| Rank 2of 2 | SAFETY TREAT FIXED OBJECTS | RUNNELS | 2019-05-07 | $4,079,164.95 | $3,077,658.58 |
| Rank 6of 10 | INSTALL MEDIAN CONCRETE BARRIERS | DENTON | 2019-04-03 | $3,384,907.80 | $3,179,440.56 |
| Rank 2of 7 | INSTALL CONCRETE TRAFFIC BARRIERS | TRAVIS | 2019-04-03 | $637,180.20 | $556,062.50 |
| Low bidof 1 | REPLACE RAIL AT BRIDGE AND REPAIR APPROACHES | CAMERON | 2019-04-03 | $2,475,986.40 | $2,475,986.40 |
| Rank 2of 2 | BRIDGE PREVENTIVE MAINTENANCE (BPM) | JEFF DAVIS | 2019-04-03 | $624,939.00 | $460,470.00 |
| Low bidof 4 | STRUCTURE REPAIR | UPTON | 2019-04-03 | $619,968.10 | $619,968.10 |
| Rank 3of 3 | CONVERT MEDIAN BARRIER | TARRANT | 2019-04-02 | $3,454,391.50 | $2,096,043.23 |
| Low bidof 1 | MEDIAN BARRIER, MILLED EDEGLINE RUMBLE STRIPS | NUECES | 2019-04-02 | $2,213,165.86 | $2,213,165.86 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.