Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
642 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | RE-ERECTING LARGE SIGNS (CALL OUT) | PECOS | 2017-04-11 | $432,500.00 | $271,265.00 |
| Rank 3of 3 | RE-ERECTING LARGE SIGNS(CALLOUT) | ECTOR | 2017-04-11 | $510,030.00 | $348,000.00 |
| Rank 4of 4 | BRIDGE JOINT RPR,CLEAN & SEAL BRIDGE JOINTS | GALVESTON | 2017-04-11 | $377,602.05 | $286,222.00 |
| Rank 3of 6 | MODERNIZE BRIDGE RAIL/APR GUARDRAIL, ETC. | CULBERSON | 2017-04-05 | $4,659,800.45 | $3,783,684.49 |
| Rank 4of 6 | REHABILITATE BRIDGE | PALO PINTO | 2017-04-05 | $5,414,243.21 | $4,656,945.55 |
| Rank 4of 7 | REPLACE AND REFURBISH LARGE SIGNS | KIMBLE | 2017-04-04 | $3,975,209.00 | $3,089,229.59 |
| Low bidof 6 | REPAIR BEAMS AND REPLACE BENT CAPS | REEVES | 2017-04-04 | $936,605.40 | $936,605.40 |
| Rank 3of 3 | JOINT/CONCRETE REP/CLEAN&SEAL/RAIL UPGRADE | CHAMBERS | 2017-03-28 | $345,010.00 | $262,770.00 |
| Rank 3of 3 | BRIDGE DECK REPAIR | HARRIS | 2017-03-14 | $228,750.00 | $133,700.00 |
| Rank 3of 7 | BRIDGE JOINT REPAIR | WALKER | 2017-03-14 | $99,400.00 | $91,577.20 |
| Rank 2of 9 | MISC. BRIDGE REPAIRS | CARSON | 2017-03-08 | $522,112.00 | $430,115.00 |
| Rank 8of 14 | CONC STRUCTURE REPAIR AND BRIDGE JOINTS | PECOS | 2017-03-08 | $469,484.00 | $318,869.50 |
| Rank 2of 6 | ARMOR JOINT REPAIR | LUBBOCK | 2017-03-08 | $719,122.50 | $590,724.00 |
| Rank 3of 4 | UPGRADE BRIDGE AND APPROACH RAILING | WICHITA | 2017-03-07 | $416,626.50 | $351,296.40 |
| Rank 5of 6 | UPGRADE BRIDGE AND APPROACH RAILING | TRAVIS | 2017-03-07 | $294,949.30 | $213,085.50 |
| Rank 5of 5 | FULL DEPTH CONCRETE REPAIR | POTTER | 2017-02-03 | $1,116,090.00 | $950,535.00 |
| Rank 2of 4 | BRIDGE REPAIRS | COKE | 2017-02-03 | $472,928.50 | $441,402.00 |
| Rank 5of 9 | MISCELLANEOUS BRIDGE REPAIRS | HOWARD | 2017-02-03 | $424,960.00 | $264,432.00 |
| Rank 5of 5 | BRIDGE PREVENTATIVE MAINTENANCE | ANGELINA | 2017-02-03 | $623,002.00 | $329,924.00 |
| Low bidof 4 | BRIDGE JOINT REPAIR AND REPLACEMENT | TRAVIS | 2017-02-03 | $581,080.00 | $581,080.00 |
| Rank 5of 5 | BPM | JEFF DAVIS | 2017-02-03 | $1,498,137.00 | $739,781.00 |
| Rank 9of 9 | BRIDGE AND SCOUR REPAIRS | ANGELINA | 2017-02-03 | $756,808.00 | $286,936.00 |
| Rank 2of 4 | FULL DEPTH CONCRETE REPAIR | MONTAGUE | 2017-02-02 | $769,322.70 | $758,517.00 |
| Rank 3of 8 | UPGRADE BRIDGE AND APPROACH RAILING | POLK | 2017-01-05 | $841,120.00 | $796,806.25 |
| Rank 2of 5 | BRIDGE MAINTENANCE | WICHITA | 2017-01-05 | $646,063.90 | $589,293.70 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.