Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
347 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 12 | RESTORATION | CALLAHAN | 2017-03-08 | $1,983,117.12 | $1,793,913.92 |
| Low bidof 5 | BRIDGE REPLACEMENT | REEVES | 2017-03-08 | $4,518,994.33 | $4,518,994.33 |
| Rank 7of 10 | MILL,SPOT REPAIR,UNDERSEAL & OVERLAY | NOLAN | 2017-03-08 | $16,167,989.69 | $14,579,827.28 |
| Low bidof 9 | MISC. BRIDGE REPAIRS | CARSON | 2017-03-08 | $430,115.00 | $430,115.00 |
| Rank 5of 14 | CONC STRUCTURE REPAIR AND BRIDGE JOINTS | PECOS | 2017-03-08 | $424,823.00 | $318,869.50 |
| Rank 3of 7 | BRIDGE REPLACMENT | WHEELER | 2017-03-07 | $3,320,994.68 | $2,923,330.68 |
| Rank 4of 4 | OVERLAY | POTTER | 2017-02-03 | $8,469,133.09 | $6,982,390.10 |
| Rank 4of 5 | FULL DEPTH CONCRETE REPAIR | POTTER | 2017-02-03 | $1,026,925.00 | $950,535.00 |
| Rank 2of 9 | MISCELLANEOUS BRIDGE REPAIRS | HOWARD | 2017-02-03 | $416,425.00 | $264,432.00 |
| Rank 4of 5 | REHAB EXISTING ROADWAY | OCHILTREE | 2017-02-02 | $3,527,541.62 | $2,999,163.70 |
| Rank 11of 14 | REMOVING TREES FROM THE CLEAR ZONE | PARMER | 2017-02-02 | $189,970.00 | $96,999.00 |
| Rank 6of 7 | GRADE,BASE,ACP,STR,BR | DAWSON | 2017-02-02 | $20,054,768.11 | $17,078,039.55 |
| Rank 6of 8 | MILL, HOTMIX INLAY | LUBBOCK | 2017-01-05 | $8,761,163.81 | $7,340,564.16 |
| Rank 6of 8 | FLX PAV STR RPR,UNDSL,&ACP OVERLAY | MITCHELL | 2017-01-05 | $3,255,844.24 | $2,838,058.33 |
| Rank 7of 11 | IMPRV GR, SFT TREAT OBJECTS, ADD PA | COLEMAN | 2017-01-05 | $2,329,307.10 | $1,678,694.17 |
| Low bidof 5 | REPAIR SETS | LUBBOCK | 2017-01-05 | $431,447.62 | $431,447.62 |
| Rank 7of 10 | BRIDGE MAINTENANCE | HALL | 2017-01-05 | $733,300.00 | $469,370.00 |
| Rank 6of 10 | REHABILITATE EXISTING ROADWAY | BROWN | 2017-01-04 | $3,973,361.76 | $3,342,055.98 |
| Rank 3of 6 | ROADWAY REHABILITATION | BREWSTER | 2017-01-04 | $4,934,981.16 | $4,010,557.70 |
| Rank 3of 7 | BRIDGE REPLACEMENT | REEVES | 2016-12-01 | $4,978,067.15 | $3,793,865.00 |
| Rank 4of 6 | REHAB EXISTING ROAD | PRESIDIO | 2016-11-03 | $1,548,266.75 | $1,271,914.40 |
| Rank 2of 2 | WIDENING EXISTING ROADWAY | HEMPHILL | 2014-06-13 | $596,368.60 | $528,753.75 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.