Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
417 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 8 | US 183 from SH 138 to N of CR 254 | WILLIAMSON | 2025-11-05 | $15,440,401.85 | $14,639,581.45 |
| Rank 5of 12 | SH 16: 0613-01-072: SFT | BEXAR | 2025-11-05 | $1,250,321.10 | $1,129,625.96 |
| Rank 4of 4 | NBI_06-165-0-1718-07-234_BMIP | MIDLAND | 2025-11-05 | $2,947,672.00 | $1,829,294.00 |
| Rank 5of 8 | TPWD - at Bastrop State Park | BASTROP | 2025-10-09 | $915,623.00 | $846,903.00 |
| Rank 2of 9 | FM 696 from US 290 to Mundine Road | BASTROP | 2025-10-08 | $6,879,000.62 | $6,445,912.15 |
| Low bidof 4 | ALPS DRIVE BRIDGE REPLACEMENT | EL PASO | 2025-10-08 | $2,528,665.60 | $2,528,665.60 |
| Rank 2of 5 | IH 10 BMIP (FY 2026) | EL PASO | 2025-09-05 | $5,505,586.36 | $4,508,215.72 |
| Low bidof 11 | On CR 143 at Dry Berry Creek | WILLIAMSON | 2025-08-08 | $1,585,425.45 | $1,585,425.45 |
| Rank 6of 8 | SH 29 - W of Algerita Hill Rd to Lehne R | BURNET | 2025-08-08 | $12,577,461.75 | $10,701,288.32 |
| Rank 3of 5 | LP 375 @ Sergeant Major Blvd. Imp. | EL PASO | 2025-07-02 | $12,749,191.05 | $11,897,786.23 |
| Rank 2of 7 | AUS_US290(HSIP23) | BLANCO | 2025-07-02 | $689,260.29 | $610,125.00 |
| Rank 5of 5 | 6482-23-001 Mill & Inlay | PECOS | 2025-07-01 | $2,327,029.90 | $1,781,182.26 |
| Low bidof 2 | ELP_US0067_2-SYS | PRESIDIO | 2025-06-05 | $3,181,974.20 | $3,181,974.20 |
| Rank 5of 8 | FM 3349 - CR 404 to FM 1660 | WILLIAMSON | 2025-06-05 | $5,486,520.54 | $4,662,190.69 |
| Low bidof 5 | SH 71 FROM BEE CREEK RD TO UPLANDS RIDGE | TRAVIS | 2025-06-05 | $1,629,167.54 | $1,629,167.54 |
| Rank 3of 4 | FM 2185 Extension | CULBERSON | 2025-06-04 | $144,386,366.30 | $123,682,483.70 |
| Low bidof 7 | FM 812 from Watts Ln to Artesian Dr | BASTROP | 2025-06-04 | $7,601,604.21 | $7,601,604.21 |
| Low bidof 4 | Borderland Expressway PH II (FM3255|RR) | EL PASO | 2025-05-02 | $112,560,910.84 | $112,560,910.84 |
| Rank 4of 6 | SAFETY_MIDLAND_TEXAS_AVE_A_ST_C_ST | MIDLAND | 2025-05-02 | $1,699,974.90 | $1,295,425.35 |
| Rank 2of 2 | SL375 SAFETY (IH10 | E OF US54) | EL PASO | 2025-05-02 | $2,979,989.25 | $2,780,753.75 |
| Rank 4of 4 | TPW PROJECT (BLACK GAP WMA) | BREWSTER | 2025-05-01 | $1,673,502.25 | $894,199.50 |
| Low bidof 3 | VA: 0915-00-274; TCD | BEXAR | 2025-05-01 | $2,368,226.00 | $2,368,226.00 |
| Rank 2of 5 | US 85 BRIDGE REHAB (OVER BNSF RR YARD) | EL PASO | 2025-05-01 | $1,181,239.96 | $967,189.90 |
| Rank 4of 4 | SL 360 - Courtyard to RM 2222 | TRAVIS | 2025-05-01 | $9,730,931.09 | $6,242,242.00 |
| Rank 2of 2 | Rigid Pavement Repair -EAO | EL PASO | 2025-05-01 | $1,975,000.00 | $1,271,955.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.