Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
417 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 7 | US 90 Sanderson Canyon Bridge @ UPRR | TERRELL | 2026-10-07 | $10,014,273.74 | $6,768,347.71 |
| Rank 6of 8 | SH 304 from Bastrop CL to 3.2 mi S of CL | CALDWELL | 2026-09-03 | $6,831,569.15 | $5,111,477.85 |
| Rank 4of 6 | SL 1604: 1479-01-028: SFT | BEXAR | 2026-09-03 | $3,943,874.43 | $3,445,214.68 |
| Low bidof 5 | FM_2448_WIDEN_AND_OVERLAY_REEVES_COUNTY | REEVES | 2026-08-06 | $8,604,312.00 | $8,604,312.00 |
| Rank 6of 6 | Wildcatter Trail - Champions, Etc. | MIDLAND | 2026-08-06 | $3,409,999.85 | $2,075,905.00 |
| Rank 5of 5 | IH10_1.2MI_E_OF_FM3078_1.6MI_W_FM2903 | REEVES | 2026-08-05 | $18,974,950.64 | $14,980,840.30 |
| Rank 4of 6 | Rigid Pavement Repair EAO/VH | EL PASO | 2026-08-05 | $2,210,250.00 | $1,772,400.00 |
| Low bidof 3 | SAT_SS0421_1of2: 0291-10-117: SFT | BEXAR | 2026-07-02 | $4,125,635.99 | $4,125,635.99 |
| Rank 3of 4 | FM3334_SH17_Old Dairy | REEVES | 2026-07-01 | $8,439,252.42 | $7,369,593.92 |
| Low bidof 5 | IH 35SB FROM INNER LP TO WESTINGHOUSE RD | WILLIAMSON | 2026-07-01 | $2,920,576.22 | $2,920,576.22 |
| Rank 2of 4 | US54(PAT FWY)Mainlane & Ramp Config | EL PASO | 2026-06-03 | $73,079,126.01 | $69,133,970.51 |
| Low bidof 6 | SH 29- W of Wolf Ranch Pkwy to IH35 | WILLIAMSON | 2026-06-03 | $7,574,102.11 | $7,574,102.11 |
| Rank 3of 7 | Dee Gabriel Collins at Cottonmouth Sch | TRAVIS | 2026-06-02 | $399,099.70 | $388,598.00 |
| Rank 4of 8 | FM 969 from Utley Rd to Howard Ln | BASTROP | 2026-05-06 | $3,309,502.87 | $3,189,428.56 |
| Rank 4of 6 | SIGNING PROJECT (US62) | EL PASO | 2026-03-05 | $428,478.00 | $320,400.00 |
| Rank 3of 3 | US90 MILL & FILL (S JEFF D CL | SH17) | PRESIDIO | 2026-03-04 | $4,667,352.16 | $4,176,256.00 |
| Rank 6of 10 | FY 2026 Bridge Preventative Maintenance | EL PASO | 2026-03-04 | $1,202,230.00 | $1,025,237.00 |
| Rank 2of 2 | Mill and Inlay - EAO | EL PASO | 2026-03-03 | $1,023,539.00 | $857,432.82 |
| Rank 2of 2 | Flexible Pavement Structure Repair - EAO | EL PASO | 2026-02-10 | $1,223,105.00 | $1,079,180.00 |
| Rank 4of 10 | FM 487 from College Ave to SH195 Bypass | WILLIAMSON | 2026-02-05 | $3,854,722.76 | $3,649,316.08 |
| Rank 3of 9 | FM 3405 from Ronald Reagan to GT Heights | WILLIAMSON | 2026-02-05 | $2,920,686.54 | $2,760,447.65 |
| Low bidof 2 | SL375 REHAB (E US54 | PARK ST) | EL PASO | 2026-02-04 | $7,195,638.49 | $7,195,638.49 |
| Rank 5of 10 | RM 150 at Onion Creek Double Crossings | HAYS | 2026-01-07 | $1,282,769.10 | $999,084.54 |
| Rank 4of 4 | AAO MBGF | PRESIDIO | 2026-01-07 | $2,053,905.00 | $1,198,026.00 |
| Rank 5of 7 | US 183 North of CR 309 | CALDWELL | 2025-12-03 | $1,842,152.08 | $1,543,698.85 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.