Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
321 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 5 | OVERLAY EXISTING ROADWAY | JASPER | 2019-02-06 | $12,567,296.62 | $10,120,117.27 |
| Low bidof 4 | RESURFACE WITH THIN OVERLAY MIXTURE | NACOGDOCHES | 2019-02-06 | $1,560,111.45 | $1,560,111.45 |
| Rank 4of 7 | RECONSTRUCT AND WIDEN PAVEMENT | NACOGDOCHES | 2019-02-05 | $4,138,267.38 | $3,823,595.55 |
| Rank 4of 4 | MILL AND OVERLAY | TYLER | 2019-02-05 | $6,828,730.70 | $4,390,336.30 |
| Rank 4of 7 | MILL & INLAY | SMITH | 2019-02-05 | $3,705,210.46 | $3,363,242.43 |
| Low bidof 4 | PLANE, OCST AND PFC | NACOGDOCHES | 2019-01-09 | $3,341,270.00 | $3,341,270.00 |
| Rank 6of 6 | TREE REMOVAL | VAN ZANDT | 2019-01-09 | $1,049,250.00 | $359,400.12 |
| Rank 5of 5 | TREE REMOVAL | WOOD | 2019-01-09 | $1,152,500.00 | $656,928.08 |
| Rank 2of 3 | PLANE, HMA & PERMEABLE FRICTION COURSE | POLK | 2019-01-08 | $3,781,777.00 | $3,604,502.78 |
| Rank 2of 4 | PLAN,CAM,HARST,SUPERPV,OCST,PFC SURF,SIGNS,PM | RUSK | 2019-01-08 | $6,436,044.82 | $5,843,498.19 |
| Rank 5of 5 | TREE REMOVAL | CHEROKEE | 2019-01-08 | $1,199,400.00 | $661,808.00 |
| Rank 3of 5 | SAFETY TREAT FIXED OBJECTS | SABINE | 2018-12-05 | $2,073,714.59 | $1,954,394.00 |
| Rank 2of 3 | RESURFACE WITH THIN OVERLAY MIXTURE | ANGELINA | 2018-12-05 | $1,310,827.52 | $1,098,660.10 |
| Rank 3of 3 | REHAB EXISTING ROADWAY/OVERLAY/STRIPING | JASPER | 2018-11-06 | $709,174.53 | $497,996.12 |
| Rank 4of 6 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JASPER | 2018-11-06 | $1,482,358.30 | $897,768.20 |
| Rank 4of 5 | BS RPR,TRT SBGD,ACP,OCST,PFC,STRS,SIGNS,PM | ANDERSON | 2018-10-03 | $7,125,911.83 | $6,180,316.71 |
| Rank 8of 8 | GR,CMT TRT SBGRD,ACP,OCST,STRS,PV MK | GREGG | 2018-10-03 | $904,999.70 | $739,231.01 |
| Rank 2of 8 | REHAB AND WIDEN EXISTING PAVMENT | HOUSTON | 2018-10-03 | $4,325,022.17 | $4,041,100.84 |
| Rank 4of 6 | MILL AND INLAY | HOUSTON | 2018-10-03 | $1,575,557.98 | $1,388,699.48 |
| Rank 3of 4 | TREE & STUMP REMOVAL (S) | HARRISON | 2018-10-03 | $528,000.00 | $454,500.00 |
| Rank 5of 6 | TREE & STUMP REMOVAL (W) | UPSHUR | 2018-10-03 | $783,500.00 | $494,994.00 |
| Rank 3of 3 | MILL AND INLAY | TRINITY | 2018-10-02 | $1,728,555.38 | $1,470,447.62 |
| Rank 3of 9 | GR,CMT TRT SBGRD,ACP,OCST,STRS,MBGF,PV MK | SMITH | 2018-09-07 | $3,249,487.55 | $3,017,503.37 |
| Rank 8of 8 | TREE REMOVAL AND TREE AND BRUSH TRIMMING | TRINITY | 2018-08-28 | $307,800.00 | $138,490.02 |
| Rank 5of 6 | TREE REMOVAL AND TREE AND BRUSH TRIMMING | ANGELINA | 2018-08-28 | $436,000.00 | $247,536.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.