Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
791 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 10 | FM 1160 BRIDGE REPLACEMENT 2305 | WHARTON | 2026-01-07 | $2,837,097.03 | $2,791,031.37 |
| Rank 4of 4 | FY26 BASE REPAIR KERRVILLE AO | KERR | 2026-01-07 | $2,168,298.39 | $1,989,196.99 |
| Rank 4of 5 | FY2026 BASE REPAIR FOR BEXAR METRO AO | BEXAR | 2026-01-07 | $1,872,547.49 | $1,555,322.57 |
| Rank 5of 6 | FY2026 BASE REPAIR FOR HONDO AO | FRIO | 2026-01-07 | $2,364,697.91 | $1,957,501.52 |
| Rank 5of 7 | FM 521 BRIDGE REPLACEMENT 2205 | MATAGORDA | 2026-01-06 | $4,396,983.32 | $3,770,670.02 |
| Rank 3of 4 | 0542-01, US59 OV | WEBB | 2026-01-06 | $17,421,354.65 | $16,415,512.14 |
| Low bidof 6 | REHABILITATE ROADWAY 2709 | FAYETTE | 2026-01-06 | $4,335,114.43 | $4,335,114.43 |
| Rank 5of 7 | FM 1160 WIDEN STRUCTURE 2610 | WHARTON | 2026-01-06 | $2,210,069.31 | $1,897,773.35 |
| Rank 7of 10 | CR 281 BRIDGE REPLACEMENT 2609 | LAVACA | 2026-01-06 | $1,459,391.52 | $1,153,909.71 |
| Rank 4of 4 | FY2026 BASE REPAIR FOR NORTH BEXAR AO | BEXAR | 2026-01-06 | $2,051,237.12 | $1,616,344.10 |
| Rank 4of 5 | FY2026 BASE REPAIR FOR NEW BRAUNFELS AO | WILSON | 2026-01-06 | $2,325,416.57 | $1,893,845.70 |
| Low bidof 8 | FM 1115 BRIDGE REPLACEMENT 2305 | FAYETTE | 2025-12-03 | $1,375,081.21 | $1,375,081.21 |
| Low bidof 12 | FM 806 BRIDGE REPLACEMENT 2303 | COLORADO | 2025-12-03 | $1,598,214.16 | $1,598,214.16 |
| Rank 2of 8 | FM 239 BRIDGE REPLACEMENT 2307 | DE WITT | 2025-12-03 | $914,064.07 | $883,521.20 |
| Rank 10of 12 | BS 71E SIDEWALKS 2709 | FAYETTE | 2025-12-03 | $5,371,339.05 | $4,027,354.50 |
| Rank 2of 6 | SH 95 - US 290 to S of FM 2336 | BASTROP | 2025-12-03 | $2,282,328.22 | $2,047,395.81 |
| Rank 2of 7 | US 183 North of CR 309 | CALDWELL | 2025-12-03 | $1,651,874.22 | $1,543,698.85 |
| Low bidof 4 | US 181: 0100-03-094; SFT | WILSON | 2025-12-03 | $184,257.74 | $184,257.74 |
| Low bidof 3 | US 59 SURFACING RESTORATION 2212 | JACKSON | 2025-12-02 | $9,131,385.82 | $9,131,385.82 |
| Rank 2of 10 | FM 1300 BRIDGE REPLACEMENT 2305 | WHARTON | 2025-12-02 | $2,716,983.94 | $2,667,278.44 |
| Rank 2of 5 | SH80KarnesOnSH80fr.5MINFM792to.5MISFM792 | KARNES | 2025-12-02 | $12,123,721.08 | $11,964,432.59 |
| Low bidof 8 | FM 1344: 1122-04-017; RER | WILSON | 2025-12-02 | $9,689,290.55 | $9,689,290.55 |
| Rank 3of 6 | SH 35 BRIDGE REPLACEMENT 2712 | JACKSON | 2025-12-02 | $26,862,178.12 | $21,288,201.98 |
| Low bidof 7 | FM 331 REHABILITATE ROADWAY 2612 | AUSTIN | 2025-12-02 | $10,744,492.63 | $10,744,492.63 |
| Rank 4of 9 | CS BRIDGE REPLACEMENT 2606 | VICTORIA | 2025-11-06 | $3,278,363.33 | $2,877,575.15 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.