Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 2 | RESURFACE ROADWAY | TRAVIS | 2024-10-02 | $1,673,616.60 | $1,673,616.60 |
| Rank 2of 4 | BASE REPAIR WITH SEAL COAT AND/OR OVERLAY | CHAMBERS | 2024-10-02 | $814,020.40 | $800,597.44 |
| Rank 4of 5 | REHABILITATE EXISTING ROADWAY | WASHINGTON | 2024-10-01 | $18,698,909.14 | $17,441,398.88 |
| Rank 2of 8 | CONSTRUCT 4-LANE DIVIDED ROADWAY ON NEW ALIGNMENT | HARRIS | 2024-10-01 | $11,350,605.97 | $10,385,128.66 |
| Low bidof 3 | RESURFACE ROADWAY | HOUSTON | 2024-10-01 | $13,181,849.79 | $13,181,849.79 |
| Rank 3of 4 | REHABILITATE EXISTING ROADWAY | ELLIS | 2024-10-01 | $15,908,763.06 | $13,439,663.24 |
| Low bidof 4 | SURFACING/ROADWAY RESTORATION | BOSQUE | 2024-10-01 | $4,687,667.81 | $4,687,667.81 |
| Rank 2of 7 | MILL AND INLAY | MEDINA | 2024-10-01 | $2,198,490.15 | $2,137,469.20 |
| Low bidof 3 | FLEXIBLE BASE | JEFFERSON | 2024-09-18 | $704,930.00 | $704,930.00 |
| Rank 2of 4 | HOT-MIX COLD-LAID | DEWITT | 2024-09-10 | $290,750.00 | $272,155.00 |
| Rank 4of 4 | SURFACING/ROADWAY RESTORATION | GALVESTON | 2024-09-06 | $23,239,123.65 | $17,513,705.44 |
| Low bidof 4 | RESURFACE ROADWAY | MCLENNAN | 2024-09-06 | $10,569,490.05 | $10,569,490.05 |
| Rank 6of 6 | SURFACING/ROADWAY RESTORATION | WALLER | 2024-09-06 | $3,032,435.44 | $2,461,983.97 |
| Rank 5of 7 | INSTALLING TURN LANES | MILAM | 2024-09-06 | $1,336,436.80 | $1,108,345.62 |
| Rank 7of 7 | SEAL COAT | MASON | 2024-09-06 | $2,330,233.34 | $1,748,508.34 |
| Rank 2of 2 | HAZARD ELIMINATION & SAFETY | LIBERTY | 2024-09-06 | $453,977.30 | $396,091.75 |
| Rank 4of 6 | HOT-MIX COLD-LAID | BLANCO | 2024-09-06 | $2,706,500.00 | $2,590,000.00 |
| Rank 4of 4 | REHABILITATE EXISTING ROADWAY | MCLENNAN | 2024-09-05 | $10,421,995.77 | $8,584,310.10 |
| Rank 2of 7 | SAFETY TREAT FIXED OBJECTS | GRIMES | 2024-09-05 | $4,507,868.17 | $4,479,429.47 |
| Low bidof 5 | PREVENTIVE MAINTENANCE | ROCKWALL | 2024-09-05 | $4,169,539.20 | $4,169,539.20 |
| Rank 3of 3 | SURFACING/ROADWAY RESTORATION | HILL | 2024-09-05 | $7,966,894.90 | $7,287,639.65 |
| Low bidof 8 | PREVENTIVE MAINTENANCE | CALDWELL | 2024-09-05 | $2,629,208.43 | $2,629,208.43 |
| Low bidof 8 | SEAL COAT | CALDWELL | 2024-09-05 | $2,033,352.21 | $2,033,352.21 |
| Rank 6of 7 | HAZARD ELIMINATION & SAFETY | BEXAR | 2024-09-05 | $2,031,042.34 | $1,732,940.00 |
| Low bidof 3 | HOT-MIX COLD-LAID | LIVE OAK | 2024-08-20 | $293,250.00 | $293,250.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.