Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 3 | ACP OVERLAY | CHAMBERS | 2024-06-05 | $918,472.89 | $918,472.89 |
| Rank 3of 4 | HOT MIX | WASHINGTON | 2024-06-05 | $787,150.00 | $724,325.00 |
| Rank 3of 4 | HOT MIX | BRAZOS | 2024-06-05 | $490,000.00 | $443,500.00 |
| Low bidof 3 | BASE FAILURE PAVEMENT REPAIR | BELL | 2024-06-05 | $875,096.05 | $875,096.05 |
| Rank 2of 2 | FLEXIBLE BASE/TY E/SHELBY (NAC & SAN AUG) | SHELBY | 2024-05-30 | $222,970.00 | $205,000.00 |
| Low bidof 1 | HOT MIX/TY C & D/SAN AUGUSTINE | SAN AUGUSTINE | 2024-05-28 | $252,355.00 | $252,355.00 |
| Rank 2of 2 | HOT MIX/SP, TY C & D/NACOGDOCHES | NACOGDOCHES | 2024-05-28 | $254,050.00 | $233,300.00 |
| Low bidof 1 | HOT MIX/TY C & D/HOUSTON | HOUSTON | 2024-05-28 | $227,809.00 | $227,809.00 |
| Low bidof 3 | HOT-MIX COLD-LAID | KARNES | 2024-05-21 | $274,700.00 | $274,700.00 |
| Low bidof 1 | HOT MIX/TY D/SABINE | SABINE | 2024-05-09 | $238,100.00 | $238,100.00 |
| Low bidof 1 | HOT MIX/TY C & D/SHELBY | SHELBY | 2024-05-09 | $238,100.00 | $238,100.00 |
| Rank 4of 4 | PREVENTIVE MAINTENANCE | TRAVIS | 2024-05-03 | $7,819,850.14 | $5,079,255.45 |
| Low bidof 5 | PREVENTIVE MAINTENANCE | TRAVIS | 2024-05-03 | $3,643,668.43 | $3,643,668.43 |
| Rank 2of 5 | HAZARD ELIMINATION & SAFETY | BELL | 2024-05-03 | $6,144,077.22 | $5,775,775.00 |
| Low bidof 3 | BRIDGE REPLACEMENT | HARDIN | 2024-05-03 | $3,831,475.49 | $3,831,475.49 |
| Low bidof 7 | WIDEN ROAD - ADD SHOULDERS | DIMMIT | 2024-05-03 | $4,036,048.13 | $4,036,048.13 |
| Rank 5of 10 | BRIDGE REPLACEMENT | MILAM | 2024-05-03 | $1,247,688.25 | $974,112.19 |
| Low bidof 4 | HOT MIX | TARRANT | 2024-05-03 | $1,033,100.00 | $1,033,100.00 |
| Low bidof 1 | ASPHALT PAVEMENT REPAIR | HARRIS | 2024-05-03 | $1,357,265.00 | $1,357,265.00 |
| Low bidof 3 | REHABILITATE EXISTING ROADWAY | DALLAS | 2024-05-02 | $28,303,655.65 | $28,303,655.65 |
| Rank 3of 3 | REHABILITATE EXISTING ROADWAY | DALLAS | 2024-05-02 | $19,969,132.81 | $18,745,268.24 |
| Rank 2of 4 | REHABILITATE EXISTING ROADWAY | JOHNSON | 2024-05-02 | $14,686,701.97 | $14,018,177.61 |
| Rank 3of 5 | REHABILITATE EXISTING ROADWAY | DENTON | 2024-05-02 | $11,418,477.88 | $9,863,216.75 |
| Rank 5of 5 | WIDEN ROAD - ADD SHOULDERS | ROBERTSON | 2024-05-02 | $3,710,758.76 | $2,487,590.72 |
| Rank 6of 6 | BRIDGE REPLACEMENT | WHARTON | 2024-05-02 | $3,697,116.03 | $2,292,072.07 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.