Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 5 | BRIDGE REPLACEMENT | FAYETTE | 2023-04-05 | $7,984,668.81 | $7,055,348.46 |
| Low bidof 5 | HAZARD ELIMINATION & SAFETY | LIBERTY | 2023-04-05 | $4,870,507.63 | $4,870,507.63 |
| Low bidof 5 | INSTALL TWO-WAY LT TURN LANE | GRIMES | 2023-04-05 | $2,060,026.16 | $2,060,026.16 |
| Low bidof 3 | INTERSECTION IMPROVEMENTS WITH RT AND/OR LT TRN LN | WASHINGTON | 2023-04-05 | $4,395,394.43 | $4,395,394.43 |
| Rank 4of 4 | BRIDGE MAINTENANCE | BASTROP | 2023-04-05 | $2,488,671.37 | $1,478,746.42 |
| Low bidof 2 | HAZARD ELIMINATION & SAFETY | GUADALUPE | 2023-04-05 | $1,371,678.58 | $1,371,678.58 |
| Rank 3of 4 | HAZARD ELIMINATION & SAFETY | MCLENNAN | 2023-04-05 | $883,831.07 | $723,086.00 |
| Rank 3of 3 | ACP OVERLAY | TRAVIS | 2023-04-05 | $42,876,409.70 | $34,906,067.35 |
| Rank 3of 3 | DENSE GRADED HOT MIX | HUNT | 2023-04-05 | $717,450.00 | $620,500.00 |
| Rank 4of 5 | BASE FAILURE PAVEMENT REPAIR | BOSQUE | 2023-04-05 | $984,012.53 | $902,942.67 |
| Rank 2of 4 | BASE FAILURE PAVEMENT REPAIR | HAMILTON | 2023-04-05 | $623,440.08 | $592,300.37 |
| Low bidof 1 | HOT MIX TY B, SP & D | ANGELINA | 2023-03-21 | $312,222.00 | $312,222.00 |
| Rank 2of 4 | ROCK/RIPRAP | JEFFERSON | 2023-03-14 | $160,625.00 | $121,750.00 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | HARDIN | 2023-03-08 | $12,495,080.67 | $12,495,080.67 |
| Low bidof 4 | BASE FAILURE PAVEMENT REPAIR | MCLENNAN | 2023-03-08 | $1,115,328.66 | $1,115,328.66 |
| Low bidof 5 | BASE FAILURE PAVEMENT REPAIR | HILL | 2023-03-08 | $860,755.58 | $860,755.58 |
| Rank 3of 3 | HOT MIX | LIMESTONE | 2023-03-08 | $900,585.00 | $840,400.00 |
| Rank 2of 3 | HOT MIX | HILL | 2023-03-08 | $905,706.00 | $874,560.00 |
| Rank 2of 3 | HOT MIX | BOSQUE | 2023-03-08 | $621,100.00 | $618,350.00 |
| Rank 2of 4 | HOT-MIX COLD-LAID | GONZALES | 2023-03-08 | $444,400.00 | $415,000.00 |
| Rank 2of 4 | HOT MIX | LAVACA | 2023-03-08 | $450,000.00 | $400,000.00 |
| Low bidof 3 | DENSE GRADED HOT MIX | RAINS | 2023-03-07 | $620,500.00 | $620,500.00 |
| Low bidof 2 | HOT MIX | VAN ZANDT | 2023-03-07 | $1,016,100.00 | $1,016,100.00 |
| Rank 2of 5 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2023-03-07 | $1,052,610.55 | $1,015,395.25 |
| Rank 2of 3 | HOT MIX | MCLENNAN | 2023-03-07 | $1,010,835.00 | $957,300.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.