Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2021-11-04 | $1,817,212.80 | $983,080.00 |
| Rank 4of 6 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LN | ROBERTSON | 2021-11-03 | $895,793.29 | $734,212.86 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | GILLESPIE | 2021-11-03 | $920,831.20 | $920,831.20 |
| Rank 4of 4 | SURFACING/ROADWAY RESTORATION | WHARTON | 2021-11-03 | $9,225,730.60 | $8,528,160.86 |
| Low bidof 4 | PREVENTIVE MAINTENANCE | BURNET | 2021-11-03 | $5,323,845.56 | $5,323,845.56 |
| Low bidof 4 | LEVEL UP, FULL DEPTH REPAIR, AND SEAL COAT | CALDWELL | 2021-11-03 | $1,830,717.82 | $1,830,717.82 |
| Rank 3of 3 | MILL, SEAL, AND OVERLAY | TRAVIS | 2021-11-03 | $2,933,637.71 | $2,526,953.80 |
| Rank 3of 3 | MILL AND INLAY | TYLER | 2021-11-03 | $744,858.59 | $707,898.30 |
| Low bidof 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | DALLAS | 2021-11-03 | $774,487.35 | $774,487.35 |
| Rank 2of 4 | ACP OVERLAY | MONTGOMERY | 2021-11-03 | $1,877,148.96 | $1,607,753.16 |
| Rank 2of 5 | SPOT BASE REPAIR | LASALLE | 2021-11-03 | $2,553,593.13 | $2,189,115.30 |
| Low bidof 2 | HOT MIX | KAUFMAN | 2021-10-26 | $257,000.00 | $257,000.00 |
| Low bidof 4 | DENSE GRADED HOT MIX | BEXAR | 2021-10-20 | $261,800.00 | $261,800.00 |
| Low bidof 4 | DENSE GRADED HOT MIX | BEXAR | 2021-10-20 | $261,800.00 | $261,800.00 |
| Rank 2of 3 | HOT MIX | KARNES | 2021-10-19 | $267,500.00 | $258,760.00 |
| Rank 3of 4 | ASPHALT | MADISON | 2021-10-19 | $315,000.00 | $292,075.00 |
| Rank 2of 2 | ASPHALT | BRAZOS | 2021-10-13 | $396,000.00 | $289,500.00 |
| Rank 2of 2 | ASPHALT | MILAM | 2021-10-13 | $170,940.00 | $163,000.00 |
| Low bidof 2 | HOT MIX | HENDERSON | 2021-10-12 | $211,200.00 | $211,200.00 |
| Rank 2of 3 | HOT MIX | MCLENNAN | 2021-10-11 | $316,893.00 | $285,647.00 |
| Low bidof 1 | HOT MIX | HAMILTON | 2021-10-11 | $296,825.00 | $296,825.00 |
| Rank 2of 3 | HOT MIX | LIMESTONE | 2021-10-11 | $295,188.00 | $286,668.00 |
| Rank 3of 4 | RESURFACE ROADWAY | CALDWELL | 2021-10-08 | $5,189,405.87 | $4,566,557.12 |
| Rank 2of 2 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T | WEBB | 2021-10-08 | $1,016,153.78 | $877,029.58 |
| Low bidof 4 | OVERLAY | KAUFMAN | 2021-10-08 | $1,312,978.52 | $1,312,978.52 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.