Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | DENSE-GRADED HOT MIX ASPHALT (MATERIAL ONLY) | WISE | 2020-09-03 | $787,500.00 | $629,250.00 |
| Low bidof 1 | PROVIDE HOT-MIX (MATERIALS ONLY) | LAMPASAS | 2020-08-27 | $297,355.00 | $297,355.00 |
| Rank 3of 4 | SFT - SAFETY IMPROVEMENT PROJECT | JEFFERSON | 2020-08-06 | $2,799,103.35 | $2,456,628.16 |
| Rank 2of 6 | BASE REPAIR | GUADALUPE | 2020-08-06 | $1,775,429.75 | $1,751,100.05 |
| Rank 5of 6 | RECONSTRUCT AND REALIGN EXISTING ROADWAY | CHAMBERS | 2020-08-05 | $9,719,046.70 | $6,739,978.21 |
| Rank 5of 5 | HAZARD ELIMINATION & SAFETY | HUNT | 2020-08-05 | $738,456.28 | $523,372.14 |
| Low bidof 5 | BRIDGE | LIBERTY | 2020-08-05 | $777,585.70 | $777,585.70 |
| Low bidof 3 | OV - OVERLAY | JEFFERSON | 2020-08-05 | $2,558,236.21 | $2,558,236.21 |
| Low bidof 7 | BASE REPAIR | BEXAR | 2020-08-05 | $2,587,245.75 | $2,587,245.75 |
| Rank 5of 7 | SIDEWALK, RAMPS, BENCHES & LIGHT'G | MILAM | 2020-07-09 | $6,095,347.30 | $4,509,031.70 |
| Rank 6of 6 | GRADING,ACP BS&SURF, BS RPR, OCST,MBGF,SIGNS,PVMK | HENDERSON | 2020-07-09 | $2,694,631.25 | $1,730,130.35 |
| Low bidof 2 | SFT - SAFETY IMPROVEMENTS | ORANGE | 2020-07-09 | $1,226,989.51 | $1,226,989.51 |
| Rank 3of 7 | PAVEMENT REPAIR | MEDINA | 2020-07-09 | $2,097,248.50 | $1,879,399.85 |
| Rank 4of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | JEFFERSON | 2020-07-09 | $1,080,705.64 | $902,311.60 |
| Rank 3of 4 | SAFETY TREAT FIXED OBJECTS, WIDEN PAVED SHOULDER T | FALLS | 2020-07-08 | $3,904,814.16 | $3,054,891.44 |
| Rank 4of 4 | OVERLAY | WILLIAMSON | 2020-07-08 | $2,765,907.40 | $1,976,494.25 |
| Low bidof 7 | PAVEMENT REPAIR | KERR | 2020-07-08 | $959,228.30 | $959,228.30 |
| Low bidof 2 | CONSTRUCT SIGNALIZED INTERSECTION | LAMPASAS | 2020-06-05 | $882,906.15 | $882,906.15 |
| Low bidof 6 | FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY, PAVEMENT | ROCKWALL | 2020-06-05 | $6,382,562.98 | $6,382,562.98 |
| Rank 3of 6 | HAZARD ELIMINATION AND SAFETY | JOHNSON | 2020-06-05 | $2,008,511.41 | $1,837,416.19 |
| Low bidof 2 | OVERLAY ROADWAY | ORANGE | 2020-06-05 | $681,341.65 | $681,341.65 |
| Rank 4of 4 | WIDEN FROM FOUR TO SIX LANES AND RESURFACE | BELL | 2020-06-04 | $42,566,891.71 | $39,466,124.00 |
| Rank 3of 5 | SFT - SAFETY IMPROVEMENT PROJECT | JASPER | 2020-06-04 | $5,047,918.19 | $4,497,777.47 |
| Low bidof 2 | 1.5" SUPERPAVE OVERLAY WITH TACK COAT | LAMPASAS | 2020-06-04 | $824,661.35 | $824,661.35 |
| Low bidof 4 | BASE FAILURE PAVEMENT REPAIR | BELL | 2020-06-04 | $1,206,361.24 | $1,206,361.24 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.