Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
1,626 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | DEPTH REPAIR, UNDERSEAL & THIN OVERLAY | WILLIAMSON | 2019-01-09 | $1,351,125.41 | $1,310,876.26 |
| Low bidof 4 | GR, BS, STR, PVMT, SIGN | HARDIN | 2019-01-09 | $1,853,959.54 | $1,853,959.54 |
| Rank 4of 4 | MILL/OVLY | BELL | 2019-01-09 | $1,126,578.83 | $1,032,767.55 |
| Rank 4of 6 | TOM OVERLAY WITH EDGE MILLING | TRAVIS | 2019-01-09 | $1,351,071.34 | $1,030,069.62 |
| Rank 3of 3 | BASE RPR, MILL, OVERLAY, PAVMT MARK | TARRANT | 2019-01-09 | $8,032,417.42 | $6,444,576.45 |
| Rank 2of 6 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | HARDIN | 2019-01-09 | $768,974.20 | $768,058.80 |
| Rank 2of 2 | MILL & INLAY | JASPER | 2019-01-09 | $627,797.90 | $570,205.22 |
| Rank 4of 6 | FLEXIBLE PAV STR REPAIR (MILL AND INLAY) | PARKER | 2019-01-09 | $2,793,386.00 | $2,439,851.02 |
| Rank 4of 5 | FLEXIBLE PAVEMENT REPAIR | WISE | 2019-01-09 | $2,538,675.37 | $1,887,509.44 |
| Low bidof 4 | MILL/PFC OVERLAY | BELL | 2019-01-08 | $6,939,665.08 | $6,939,665.08 |
| Rank 3of 6 | REPLACE BRIDGE AND APPROACHES | ORANGE | 2019-01-08 | $4,351,317.10 | $3,732,469.40 |
| Rank 3of 6 | TOM OVERLAY | TRAVIS | 2019-01-08 | $3,138,300.11 | $2,568,399.55 |
| Low bidof 7 | LVL-UP, REPAIR, STRUCT OVLY & TOM | LEE | 2019-01-08 | $1,996,137.88 | $1,996,137.88 |
| Low bidof 4 | BS RPR/SEAL OVLY | CORYELL | 2019-01-08 | $1,435,578.35 | $1,435,578.35 |
| Rank 4of 7 | FULL DEPTH REPAIR, UNDERSEAL AND TOM | BLANCO | 2019-01-08 | $1,797,242.10 | $1,474,737.25 |
| Low bidof 4 | MILL/INLAY | BELL | 2019-01-08 | $1,265,164.93 | $1,265,164.93 |
| Low bidof 5 | FULL DEPTH REPAIR AND OVERLAY | WILLIAMSON | 2019-01-08 | $3,898,284.65 | $3,898,284.65 |
| Rank 4of 4 | BASE RPR, MILL, TOM OVERLAY, PAV MK | SOMERVELL | 2019-01-08 | $2,946,462.67 | $2,356,575.65 |
| Rank 5of 5 | PLANE AND OVERLAY | CHAMBERS | 2019-01-08 | $420,314.02 | $380,486.72 |
| Rank 3of 6 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | ERATH | 2019-01-08 | $3,189,060.00 | $2,472,652.50 |
| Rank 3of 3 | OVERLAY EXISTING ROADWAY | TYLER | 2018-12-06 | $6,471,344.15 | $5,442,445.86 |
| Rank 8of 9 | REHABILITATE EXISTING PAVEMENT | ELLIS | 2018-12-06 | $9,984,758.34 | $7,140,372.10 |
| Rank 3of 4 | FLEXIBLE PAVEMENT REPAIR | DALLAS | 2018-12-06 | $499,704.30 | $363,617.25 |
| Rank 4of 6 | PFC-C OVERLAY | TRAVIS | 2018-12-05 | $2,599,762.85 | $2,265,980.67 |
| Low bidof 9 | GRADING, STRUCTURES, BASE, PAVING | KAUFMAN | 2018-12-05 | $1,047,916.23 | $1,047,916.23 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.