Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
439 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 7 | BRIDGE REPLACEMENT | HILL | 2021-07-01 | $3,259,886.92 | $3,137,765.69 |
| Rank 4of 6 | GR, STR, AND BASE REPAIR | DALLAS | 2021-07-01 | $5,109,483.75 | $4,547,348.26 |
| Rank 9of 13 | CONSTRUCT 0 TO 6 LANE GRADE SEPARATION OVER US 377 | DENTON | 2021-06-04 | $42,870,353.94 | $36,943,838.16 |
| Rank 6of 6 | REHABILITATION OF EXISTING ROAD | RAINS | 2021-06-03 | $5,272,642.51 | $4,114,424.46 |
| Rank 2of 4 | REHABILITATE EXISTING ROADWAY | WISE | 2021-06-03 | $5,148,495.00 | $4,701,956.70 |
| Rank 8of 13 | REMOVE/REPLACE BRIDGE RAIL | KAUFMAN | 2021-06-03 | $2,078,627.82 | $1,587,185.64 |
| Rank 5of 5 | REHABILITATE EXISTING ROADWAY | HUNT | 2021-06-03 | $2,619,806.29 | $2,413,923.33 |
| Rank 3of 4 | INTERSECTION IMPROVEMENTS WITH R/L TURN LANES | ELLIS | 2021-06-03 | $1,388,502.21 | $1,371,422.70 |
| Rank 2of 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | COLLIN | 2021-06-03 | $4,739,816.39 | $4,616,813.49 |
| Rank 5of 10 | RECONFIGURE INTERSECTION WITH SIDEWALK IMPROVEMENT | DALLAS | 2021-05-06 | $6,799,187.12 | $6,336,366.88 |
| Rank 5of 5 | IMPROVE APPROACH, WIDEN BRIDGE TO ADD TURN LANE | DALLAS | 2021-05-06 | $3,576,499.56 | $3,246,150.50 |
| Rank 2of 9 | BRIDGE REPLACEMENT | NAVARRO | 2021-05-05 | $2,743,054.48 | $2,712,401.60 |
| Rank 6of 6 | INSTALL TRAFFIC SIGNAL | WISE | 2021-04-08 | $3,177,802.39 | $2,749,994.21 |
| Rank 5of 5 | TRAFFIC SIGNAL IMPROVEMENTS | DALLAS | 2021-04-08 | $2,469,439.80 | $2,040,000.00 |
| Rank 6of 9 | RESTORATION OF EXISTING PAVEMENT & ADD SHOULDERS | NAVARRO | 2021-03-05 | $8,594,279.01 | $7,986,235.47 |
| Rank 5of 7 | BRIDGE REPLACEMENT | COOKE | 2021-03-05 | $2,388,227.79 | $2,136,179.06 |
| Rank 9of 9 | RESURFACE ROADWAY | TARRANT | 2021-03-05 | $2,664,091.06 | $1,656,779.12 |
| Rank 9of 10 | BRIDGE REPLACEMENT | VAN ZANDT | 2021-03-05 | $1,647,471.72 | $1,247,129.38 |
| Rank 4of 12 | BRIDGE REPLACEMENT | PARKER | 2021-03-05 | $1,138,039.30 | $1,069,862.20 |
| Rank 3of 6 | REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS | DENTON | 2021-03-05 | $6,148,114.54 | $5,902,974.49 |
| Rank 2of 9 | RECONSTRUCT EXISTING ROADWAY | PARKER | 2021-03-04 | $1,023,337.62 | $1,001,549.09 |
| Low bidof 11 | RESTORATION OF EXISTING PAVEMENT AND ADD SHOULDERS | KAUFMAN | 2021-02-05 | $7,598,568.10 | $7,598,568.10 |
| Rank 2of 10 | RESTORE EXSISTING PAVEMT, ADD SHOULDERS | COLLIN | 2021-02-05 | $6,059,155.28 | $5,929,503.18 |
| Rank 5of 13 | CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENT | COLLIN | 2021-02-05 | $257,660.00 | $197,225.00 |
| Rank 5of 7 | RAMP MODIFICATIONS, BRIDGE & PAVEMENT REPAIRS | LEON | 2021-02-04 | $2,149,037.97 | $1,382,171.20 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.