Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
419 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 8of 10 | BRIDGE REPLACEMENT | MONTGOMERY | 2017-10-03 | $1,695,467.00 | $1,488,885.75 |
| Rank 5of 11 | INSTALL SIDEWALKS | TRAVIS | 2017-10-03 | $526,364.00 | $496,481.33 |
| Rank 4of 9 | CULVERT REPAIR | VAN ZANDT | 2017-10-03 | $518,786.00 | $430,297.43 |
| Rank 6of 9 | PEDESTRIAN TRAIL- SIDEWALKS | LLANO | 2017-09-07 | $1,374,551.64 | $1,011,049.85 |
| Rank 2of 7 | CONSTRUCT SHARED USE PATH | LAMAR | 2017-09-07 | $867,041.24 | $679,839.40 |
| Rank 5of 7 | CONSTRUCT SHARED USE PATH | RED RIVER | 2017-09-07 | $1,232,499.32 | $967,747.60 |
| Rank 4of 9 | SEAL COAT, PROVIDE ADDITIONAL PAVED ROADWAY WIDTH | FRANKLIN | 2017-09-07 | $1,705,571.94 | $1,539,938.35 |
| Low bidof 5 | CONSTRUCT CURB RAMPS | DALLAS | 2017-08-09 | $2,650,440.80 | $2,650,440.80 |
| Rank 3of 7 | REHABILITATION OF EXISTING ROAD | RAINS | 2017-08-09 | $6,584,968.93 | $6,503,123.07 |
| Rank 5of 8 | RPLC BR&APPR,GRADING,ACP BS&SURF,MBGF,PV MK | SMITH | 2017-08-09 | $1,171,873.01 | $1,077,661.37 |
| Rank 5of 7 | GR,STR,BASE,SURFACING | HARRISON | 2017-08-09 | $2,697,670.80 | $2,284,633.31 |
| Rank 3of 5 | CONSTRUCT CURB RAMPS | TARRANT | 2017-08-08 | $2,130,491.90 | $2,091,441.77 |
| Rank 3of 5 | REPL BR & APPRS | DALLAS | 2017-08-08 | $3,198,554.13 | $2,883,799.00 |
| Rank 3of 7 | CLEAN/PAINT STEEL GRDRS,REPL BR RAIL,CONC DK OVLY | ANDERSON | 2017-08-08 | $1,707,364.50 | $1,646,254.33 |
| Rank 2of 5 | SAFETY TREAT FIXED OBJECTS | GRAYSON | 2017-08-08 | $932,086.00 | $930,195.00 |
| Rank 2of 6 | WIDEN PAVEMENT | RAINS | 2017-08-08 | $755,603.86 | $685,540.51 |
| Low bidof 8 | CULVERT REPAIR | CHEROKEE | 2017-07-13 | $60,270.00 | $60,270.00 |
| Rank 3of 8 | BRIDGE REPLACEMENT | SHELBY | 2017-07-12 | $700,129.00 | $619,833.67 |
| Rank 2of 10 | CONSTRUCT CURB RAMPS_(VARIOUS LOC IN BEXAR CO) | BEXAR | 2017-07-12 | $3,886,170.40 | $3,495,290.12 |
| Rank 5of 7 | GR, FLX BS, TCST, STRS, PV MK | VAN ZANDT | 2017-07-12 | $4,361,625.93 | $3,972,777.00 |
| Rank 2of 7 | REPLACE BRIDGE AND APPROACHES | HARRISON | 2017-07-12 | $452,957.10 | $444,410.70 |
| Rank 5of 6 | REPLACE BRIDGE AND APPROACHES | WICHITA | 2017-07-12 | $2,831,500.98 | $2,398,060.27 |
| Rank 3of 5 | REMOVE & REPLACE 2 STRUCTURES | SAN AUGUSTINE | 2017-07-11 | $6,008,069.42 | $5,292,158.61 |
| Low bidof 8 | GR, FLX BS, TCST, STRS, PVT MRKG | VAN ZANDT | 2017-07-11 | $4,481,848.93 | $4,481,848.93 |
| Rank 2of 8 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2017-07-11 | $1,378,420.50 | $1,359,589.42 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.