Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
419 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 8 | FM 547 FROM US 380 TO FM 6 | COLLIN | 2025-05-02 | $20,210,713.99 | $16,422,403.23 |
| Low bidof 6 | CS FROM BELT LINE ROAD AT GOFF BRANCH TO | DALLAS | 2025-05-02 | $8,168,666.00 | $8,168,666.00 |
| Rank 2of 6 | SH 34 - 1 | HUNT | 2025-05-02 | $4,172,220.50 | $4,125,933.95 |
| Rank 5of 5 | FY 27 RR Bridges @ Various Locations | SMITH | 2025-05-02 | $4,743,295.45 | $2,796,332.40 |
| Rank 4of 8 | SH 7 at Morral Creek (BR) | NACOGDOCHES | 2025-05-01 | $7,114,128.00 | $6,230,927.11 |
| Rank 4of 13 | YOUNG, MOBBERLY-MLK JR BLVD, HSIP 2025 | GREGG | 2025-05-01 | $769,149.00 | $620,186.45 |
| Rank 9of 9 | FM 2727 FROM SH 243 TO FM 429 | KAUFMAN | 2025-04-03 | $22,786,828.71 | $16,864,509.37 |
| Rank 4of 9 | FM 21 Rehab | FRANKLIN | 2025-04-03 | $11,015,180.81 | $9,113,598.80 |
| Rank 2of 3 | BRIDGE REPLACEMENT | LAMAR | 2024-03-06 | $4,241,889.46 | $3,732,598.33 |
| Rank 3of 5 | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) | WOOD | 2024-03-05 | $43,525,687.69 | $37,954,683.08 |
| Low bidof 4 | BRIDGE REPLACEMENT | FANNIN | 2024-03-05 | $2,948,142.08 | $2,948,142.08 |
| Rank 2of 6 | CULVERT REPAIR | SMITH | 2024-02-20 | $92,360.00 | $83,901.90 |
| Low bidof 10 | BRIDGE REPLACEMENT | KAUFMAN | 2024-02-02 | $5,443,323.50 | $5,443,323.50 |
| Rank 4of 5 | BRIDGE MAINTENANCE | FANNIN | 2024-02-02 | $2,353,933.10 | $2,050,081.00 |
| Rank 5of 8 | BRIDGE MAINTENANCE | RED RIVER | 2024-02-02 | $699,506.50 | $627,372.00 |
| Rank 5of 7 | CULVERT EXTENSION & CROSS DRAINAGE | COLLIN | 2024-02-02 | $523,895.00 | $397,771.50 |
| Rank 5of 8 | BRIDGE PREVENTATIVE MAINTENANCE | HUNT | 2024-02-02 | $472,190.00 | $416,470.00 |
| Rank 4of 6 | BRIDGE MAINTENANCE | DALLAS | 2024-02-01 | $4,257,231.00 | $3,487,274.77 |
| Rank 7of 7 | HAZARD ELIMINATION & SAFETY | PANOLA | 2024-02-01 | $2,354,265.00 | $1,105,559.41 |
| Low bidof 7 | BRIDGE REPLACEMENT | GRAYSON | 2024-02-01 | $1,590,708.54 | $1,590,708.54 |
| Rank 3of 5 | PREVENTIVE MAINTENANCE | GRAYSON | 2023-12-06 | $575,030.00 | $363,240.00 |
| Rank 5of 8 | BRIDGE REPLACEMENT | RAINS | 2023-12-06 | $544,940.00 | $424,043.00 |
| Rank 9of 10 | PREVENTIVE MAINTENANCE | LAMAR | 2023-12-06 | $680,395.00 | $297,263.00 |
| Rank 5of 6 | HAZARD ELIMINATION & SAFETY | DELTA | 2023-12-05 | $5,176,818.20 | $4,447,953.00 |
| Rank 4of 5 | BRIDGE MAINTENANCE | GRAYSON | 2023-12-05 | $1,291,000.00 | $851,850.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.