Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
35 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 6 | FM 526; North of US 90 to BU 90 | HARRIS | 2025-01-08 | $1,378,850.77 | $1,067,872.27 |
| Rank 5of 6 | SURFACING/ROADWAY RESTORATION | WALLER | 2024-09-06 | $2,883,542.53 | $2,461,983.97 |
| Rank 6of 7 | SAFETY TREAT FIXED OBJECTS | GRIMES | 2024-09-05 | $5,264,459.05 | $4,479,429.47 |
| Rank 4of 4 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-08-01 | $5,122,605.42 | $4,137,770.75 |
| Rank 3of 4 | REHABILITATION OF EXISTING ROADWAY | BRAZORIA | 2024-06-11 | $421,331.55 | $368,714.72 |
| Rank 4of 4 | SURFACING/ROADWAY RESTORATION | LIBERTY | 2024-03-06 | $2,943,676.21 | $2,261,889.84 |
| Rank 5of 5 | SURFACING/ROADWAY RESTORATION | FORT BEND | 2024-03-06 | $1,823,450.70 | $1,497,972.35 |
| Rank 2of 2 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-02-01 | $1,650,907.36 | $1,439,308.97 |
| Rank 5of 7 | ACP OVERLAY | WALLER | 2024-01-04 | $726,361.35 | $598,559.40 |
| Rank 4of 5 | ACP OVERLAY | MONTGOMERY | 2023-12-05 | $1,997,682.66 | $1,704,616.38 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.