Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
288 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 8 | PREV MNT OF SGNL EQUIP | HARRIS | 2020-02-07 | $2,087,408.18 | $935,089.25 |
| Rank 2of 7 | MNT OF ILLUMINATION SYS | HARRIS | 2020-02-07 | $1,054,964.18 | $969,086.75 |
| Rank 4of 6 | CONSTRUCTION OF TRAFFIC SIGNAL WORK | HARRIS | 2020-02-06 | $2,181,671.17 | $1,780,190.00 |
| Rank 2of 6 | INSTALL LED FLASHING CHEVRONS (CURVE) | BRAZORIA | 2020-02-06 | $209,086.06 | $150,250.00 |
| Rank 4of 4 | CONSTRUCTION/INSTALLATION OF TRAFFIC SIGNAL | GALVESTON | 2020-01-09 | $302,475.41 | $203,914.90 |
| Rank 6of 7 | TRAFFIC SIGNAL IMPROVEMENTS | HARRIS | 2019-12-04 | $1,177,907.81 | $729,130.11 |
| Rank 5of 6 | HAZARD ELIMINATION & SAFETY | HARRIS | 2019-11-05 | $710,662.65 | $485,208.48 |
| Rank 5of 5 | HAZARD ELIMINATION AND SAFETY | HARRIS | 2019-10-03 | $263,976.28 | $226,988.26 |
| Rank 3of 4 | TRAFFIC CONTROL DEVICES | TARRANT | 2019-09-05 | $870,323.46 | $753,806.24 |
| Rank 7of 7 | INSTALL HIGH MAST LIGHTING | HARRIS | 2019-08-07 | $12,452,172.09 | $9,799,999.16 |
| Rank 2of 5 | INST ADVANCE WARNING SIGNALS & FLASHING CHEVRONS | WALLER | 2019-08-06 | $522,854.15 | $519,842.50 |
| Low bidof 3 | MNT OF COMMUNICATION CABLE | HARRIS | 2019-08-06 | $925,713.29 | $925,713.29 |
| Rank 4of 5 | MNT OF ILLUM SYSTEMS | HARRIS | 2019-06-05 | $2,126,937.69 | $1,234,412.00 |
| Rank 4of 4 | MNT OF TRAFFIC SIGNLS | HARRIS | 2019-06-05 | $3,275,439.10 | $1,803,181.79 |
| Rank 6of 7 | UPGRADE HIGH MAST ILLUMINATION | HARRIS | 2019-06-04 | $4,037,139.71 | $3,258,510.85 |
| Rank 4of 4 | INSTALL ITS EQUIPMENT & INFRASTRUCTURE | HARRIS | 2019-05-07 | $4,986,001.22 | $3,339,515.66 |
| Rank 4of 4 | INSTALL FLASHING BEACON & SAFETY LT | LUBBOCK | 2019-04-02 | $225,681.15 | $176,975.00 |
| Rank 7of 7 | DISTRICT WIDE SMALL SIGN REPLACEMENT | NUECES | 2019-03-06 | $2,957,780.62 | $1,847,391.50 |
| Low bidof 4 | IMPROVE TRAFFIC SIGNALS AND INTERCONNECT SIGNALS | NUECES | 2019-02-05 | $3,511,807.36 | $3,511,807.36 |
| Rank 4of 5 | HIGH MAST AND UNDERPASS LIGHTING UPGRADES | HARRIS | 2019-02-05 | $5,777,139.17 | $4,728,767.58 |
| Rank 4of 4 | INSTLL SGNLS AND SGNS | BELL | 2019-01-09 | $366,379.71 | $288,044.60 |
| Rank 3of 4 | REPLACE | HARRIS | 2019-01-09 | $2,493,429.41 | $1,820,450.16 |
| Rank 6of 6 | SAFETY LIGHTING | KARNES | 2019-01-08 | $1,091,747.04 | $749,585.70 |
| Rank 5of 5 | INSTALL SAFETY LIGHTING | FAYETTE | 2019-01-08 | $332,953.40 | $235,017.20 |
| Rank 2of 4 | TRAFFIC SIGNAL WORK CONSISTING OF A NON-SITE SPECI | HARRIS | 2018-12-06 | $1,970,211.30 | $1,896,973.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.