Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
191 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 8 | 2025-06 BPM South | HOUSTON | 2025-07-30 | $293,072.00 | $230,695.00 |
| Rank 2of 7 | FY25 - Freestone US84 - 07 | FREESTONE | 2025-07-08 | $218,320.50 | $194,063.50 |
| Rank 5of 7 | BRIDGE PREVENTATIVE MAINTENANCE - DW | BELL | 2025-06-18 | $986,100.00 | $897,734.00 |
| Rank 2of 9 | BPM FY 2026 Atlanta District | BOWIE | 2025-06-18 | $648,119.00 | $602,634.00 |
| Low bidof 6 | FY25 - Freestone FM 489 BPM | FREESTONE | 2025-06-12 | $188,514.00 | $188,514.00 |
| Rank 2of 9 | FUA Erosion Repair | LAMAR | 2025-06-05 | $321,479.00 | $309,933.00 |
| Rank 3of 12 | FY25 - Freestone IH 45 BPM - 05 | FREESTONE | 2025-05-06 | $481,398.00 | $422,313.00 |
| Rank 5of 6 | FY 25 - DW Bridge Repair | BRAZOS | 2025-05-02 | $834,203.00 | $590,567.00 |
| Rank 5of 9 | Steel Piling Repair | WHARTON | 2025-04-28 | $834,425.00 | $602,966.86 |
| Rank 8of 12 | 2025 Callout Concrete Repair | TAYLOR | 2025-04-01 | $805,850.00 | $643,004.00 |
| Low bidof 8 | Miscellaneous Concrete Repair - DW | MCLENNAN | 2025-03-20 | $420,190.00 | $420,190.00 |
| Rank 4of 14 | FY2025_VA_Bridge Maint - BMN | ANGELINA | 2025-03-05 | $877,094.00 | $821,221.00 |
| Rank 2of 19 | FM 2571 - AT Gazley Crk - 25 BMIP | BASTROP | 2025-03-04 | $182,924.00 | $180,204.00 |
| Rank 3of 12 | FY25 BPM IH35/US90A/FM3009 | COMAL | 2025-02-20 | $154,978.00 | $100,463.00 |
| Rank 5of 13 | FY25 BPM FM 306 AT SUCHE AND POTTER CRK | COMAL | 2025-02-20 | $196,259.00 | $135,300.00 |
| Rank 6of 11 | FY25 BPM SH 41 AT DRAW/SH 16 AT DREAN CR | KERR | 2025-02-20 | $91,221.00 | $69,326.00 |
| Rank 2of 14 | Atascosa Bridge Preventative Maint | ATASCOSA | 2025-02-20 | $84,682.00 | $67,357.00 |
| Rank 2of 13 | US 290 - At Cottonwd & B Dry Ck, 25BMIP | TRAVIS | 2025-02-06 | $306,528.00 | $304,980.00 |
| Rank 2of 10 | Bridge Preventative Maintenance 09 1024 | ELLIS | 2025-01-15 | $776,444.00 | $733,230.00 |
| Rank 5of 7 | BPM FM709 01 0125 | NAVARRO | 2025-01-15 | $313,025.00 | $223,095.00 |
| Low bidof 6 | BRIDGE PREVENTATIVE MAINTENANCE | RED RIVER | 2024-11-21 | $327,282.00 | $327,282.00 |
| Low bidof 8 | CONCRETE STRUCTURE REPAIR | KLEBERG | 2024-11-19 | $296,578.00 | $296,578.00 |
| Rank 5of 6 | BRIDGE PREVENTATIVE MAINTENANCE | NACOGDOCHES | 2024-10-31 | $384,781.00 | $323,160.00 |
| Rank 5of 9 | BRIDGE PREVENTATIVE MAINTENANCE | KIMBLE | 2024-10-15 | $854,180.00 | $652,583.00 |
| Low bidof 9 | EROSION REPAIR | MEDINA | 2024-05-16 | $222,736.00 | $222,736.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.