Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
191 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 6 | BRIDGE PREVENTATIVE MAINTENANCE | COMANCHE | 2021-10-07 | $677,180.00 | $595,430.00 |
| Rank 4of 8 | SCOUR AND EROSION CONTROL | CALDWELL | 2021-09-02 | $781,886.80 | $675,857.89 |
| Low bidof 6 | BPM, FY2022 | BOWIE | 2021-09-01 | $656,799.00 | $656,799.00 |
| Low bidof 6 | STATE PARK IMPROVEMENTS | BASTROP | 2021-07-01 | $941,090.50 | $941,090.50 |
| Rank 5of 8 | DRAINAGE IMPROVEMENTS | TAYLOR | 2021-05-06 | $207,906.00 | $174,853.00 |
| Rank 11of 11 | BRIDGE REPAIR | ECTOR | 2021-05-06 | $581,240.00 | $388,307.00 |
| Low bidof 5 | DITCH CLEANING AND RESHAPING | KAUFMAN | 2021-05-05 | $436,165.00 | $436,165.00 |
| Rank 2of 7 | BRIDGE STRUCTURE REPAIRS | TOM GREEN | 2021-04-14 | $240,778.20 | $239,260.00 |
| Rank 4of 9 | CONCRETE REPAIRS | KIMBLE | 2021-04-08 | $586,701.10 | $498,855.00 |
| Low bidof 10 | CONCRETE STRUCTURE REPAIR | LIVE OAK | 2021-03-23 | $238,185.24 | $238,185.24 |
| Low bidof 5 | DRAINAGE IMPROVEMENT AND/OR REPAIRS | NUECES | 2021-03-23 | $278,753.05 | $278,753.05 |
| Rank 6of 6 | BRIDGE PREVENTATIVE MAINTENANCE | BEXAR | 2021-03-17 | $129,852.00 | $67,990.00 |
| Rank 10of 13 | RIPRAP REPAIR | ATASCOSA | 2021-03-17 | $132,126.00 | $99,804.00 |
| Rank 8of 12 | BRIDGE SUBSTRUCTURE REPAIR | ATASCOSA | 2021-03-17 | $77,948.00 | $60,160.00 |
| Rank 4of 10 | BPM PROJECT | FAYETTE | 2021-03-05 | $828,971.00 | $629,249.50 |
| Rank 2of 6 | BRIDGE STEEL PILE REPAIR | ERATH | 2021-02-10 | $50,398.00 | $48,115.59 |
| Rank 2of 7 | BRIDGE PREVENTIVE MAINTENANCE | HOUSTON | 2021-01-20 | $211,150.00 | $206,123.00 |
| Rank 7of 8 | BRIDGE PREVENTATIVE MAINTENANCE | SHELBY | 2021-01-20 | $370,186.00 | $235,526.00 |
| Low bidof 9 | CULVERT EXTENSION REPLACEMENT CROSS | ELLIS | 2021-01-12 | $200,250.00 | $200,250.00 |
| Rank 5of 12 | MISCELLANEOUS CONCRETE REPAIR | ELLIS | 2021-01-12 | $259,962.50 | $235,572.50 |
| Low bidof 10 | BRIDGE PREVENTATIVE MAINTENANCE | BOSQUE | 2021-01-08 | $173,337.60 | $173,337.60 |
| Rank 7of 11 | BRIDGE MAINTENANCE | PARKER | 2021-01-07 | $1,958,905.00 | $1,487,924.50 |
| Rank 3of 11 | BPM-ABUTMENT AND RIPRAP EROSION REPAIR | GRAYSON | 2020-12-17 | $185,679.00 | $137,293.00 |
| Rank 6of 12 | BPM - EROSION AND ROCK RIPRAP REPAIRS | LAMAR | 2020-12-17 | $146,700.00 | $121,579.47 |
| Rank 2of 16 | SCOUR REPAIR | BRAZOS | 2020-12-17 | $216,647.87 | $204,920.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.