Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
147 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | BRIDGE REPLACEMENT | NEWTON | 2022-03-03 | $2,839,452.46 | $2,254,911.00 |
| Rank 5of 5 | BRIDGE MAINTENANCE | DEWITT | 2022-03-03 | $1,314,100.00 | $483,368.00 |
| Low bidof 4 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | FAYETTE | 2021-12-02 | $2,774,624.51 | $2,774,624.51 |
| Rank 4of 4 | BRIDGE REPLACEMENT | LAVACA | 2021-12-02 | $1,156,874.65 | $965,493.88 |
| Rank 2of 5 | BRIDGE REPLACEMENT | HOUSTON | 2021-07-02 | $1,195,546.28 | $1,191,638.80 |
| Low bidof 3 | REPLACE BRIDGE AND APPROACHES | JACKSON | 2021-07-02 | $1,283,044.73 | $1,283,044.73 |
| Low bidof 3 | BRIDGE REPLACEMENT | FAYETTE | 2021-07-02 | $805,990.58 | $805,990.58 |
| Low bidof 6 | REPLACE BRIDGE AND APPROACHES | GALVESTON | 2021-07-02 | $474,034.06 | $474,034.06 |
| Low bidof 10 | REPLACE BRIDGE AND APPROACHES | WALLER | 2021-07-01 | $560,102.49 | $560,102.49 |
| Low bidof 6 | BRIDGE REPLACEMENT | JEFFERSON | 2021-03-04 | $2,659,519.15 | $2,659,519.15 |
| Low bidof 4 | REPLACE BRIDGE AND APPROACHES | JACKSON | 2021-03-04 | $2,346,537.14 | $2,346,537.14 |
| Low bidof 5 | INTERSECTION IMPROVEMENT WITH RIGHT TURN LANES | HARRIS | 2021-03-04 | $925,571.79 | $925,571.79 |
| Rank 3of 10 | EMBANKMENT STABILIZATION | MATAGORDA | 2021-02-05 | $68,900.00 | $57,975.10 |
| Rank 3of 11 | SLOPE REPAIR, INSTALL STEEL PILING | GALVESTON | 2021-02-05 | $503,046.41 | $471,058.25 |
| Rank 2of 9 | BRIDGE REPLACEMENT | WHARTON | 2021-02-04 | $1,421,584.13 | $1,267,616.62 |
| Rank 6of 7 | BRIDGE PREVENTIVE MAINTENANCE | HOUSTON | 2021-01-20 | $299,739.59 | $206,123.00 |
| Rank 4of 8 | BRIDGE PREVENTATIVE MAINTENANCE | SHELBY | 2021-01-20 | $340,255.64 | $235,526.00 |
| Rank 3of 3 | GUARDRAIL REPAIR | WALLER | 2021-01-12 | $518,177.90 | $185,582.50 |
| Rank 2of 9 | RETAINING WALL AND DRAINAGE REPAIR | HARRIS | 2021-01-07 | $360,312.00 | $323,749.50 |
| Rank 5of 9 | CLEAN & SEAL JOINTS/EROSION CNTRL/CONC REPAIR | CHAMBERS | 2021-01-06 | $83,153.00 | $72,198.00 |
| Rank 6of 16 | SCOUR REPAIR | BRAZOS | 2020-12-17 | $294,152.00 | $204,920.00 |
| Rank 9of 11 | SCOUR REPAIR & PILE REPAIR | FREESTONE | 2020-12-17 | $171,700.00 | $70,040.00 |
| Rank 12of 13 | STONE RIP RAP AND SCOUR COUNTERMEASURES | MILAM | 2020-12-17 | $219,335.00 | $72,031.20 |
| Rank 2of 9 | SIDEWALK AND ADA RAMP CONSTRUCTION | HARRIS | 2020-10-01 | $923,412.14 | $877,513.25 |
| Rank 7of 13 | CONSTRUCT NOISE BARRIER | FORT BEND | 2020-09-03 | $1,393,706.00 | $1,285,463.50 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.