Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
752 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 6 | BRIDGE REPLACEMENT | GRIMES | 2023-08-02 | $2,587,672.11 | $2,278,373.18 |
| Low bidof 3 | REHABILITATE AND WIDEN ROADWAY | MCLENNAN | 2023-08-02 | $2,735,685.61 | $2,735,685.61 |
| Rank 7of 8 | SURFACING/ROADWAY RESTORATION | MONTGOMERY | 2023-08-02 | $1,322,032.17 | $1,006,888.63 |
| Rank 5of 5 | BRIDGE REPLACEMENT | WALKER | 2023-08-02 | $1,178,823.50 | $832,940.17 |
| Rank 3of 3 | HOT MIX | CORYELL | 2023-08-02 | $2,255,000.00 | $1,944,975.00 |
| Rank 3of 5 | REHABILITATE EXISTING ROADWAY | BRAZOS | 2023-06-28 | $11,203,481.31 | $9,980,813.57 |
| Low bidof 4 | INSTALL RAISED MEDIAN | WASHINGTON | 2023-06-28 | $6,554,342.36 | $6,554,342.36 |
| Low bidof 2 | REPLACE BRIDGE AND APPROACHES | CORYELL | 2023-06-28 | $3,507,187.52 | $3,507,187.52 |
| Rank 2of 9 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | BRAZOS | 2023-06-27 | $4,592,733.12 | $4,034,958.95 |
| Rank 5of 5 | INSTALLATION OF DRIVEWAY PIPE | BRAZOS | 2023-06-27 | $1,998,240.00 | $949,656.00 |
| Rank 2of 4 | ROCK/RIPRAP | NAVARRO | 2023-06-07 | $102,000.00 | $93,090.00 |
| Low bidof 4 | REPLACE BRIDGE AND APPROACHES | HAMILTON | 2023-05-05 | $906,655.80 | $906,655.80 |
| Rank 2of 4 | BRIDGE REPLACEMENT | ROBERTSON | 2023-05-05 | $794,858.95 | $722,351.41 |
| Rank 3of 4 | SPOT BASE REPAIR | BRAZOS | 2023-05-05 | $1,951,400.00 | $1,557,750.00 |
| Rank 4of 4 | MILL AND INLAY | BRAZOS | 2023-05-04 | $1,471,858.00 | $1,293,480.00 |
| Rank 2of 4 | SPOT BASE REPAIR | WASHINGTON | 2023-05-04 | $1,624,225.00 | $1,067,637.50 |
| Low bidof 2 | RECONSTRUCT EXISTING ROADWAY | NAVARRO | 2023-04-05 | $6,473,924.21 | $6,473,924.21 |
| Rank 2of 5 | INSTALL TWO-WAY LT TURN LANE | GRIMES | 2023-04-05 | $2,159,754.63 | $2,060,026.16 |
| Rank 2of 3 | INTERSECTION IMPROVEMENTS WITH RT AND/OR LT TRN LN | WASHINGTON | 2023-04-05 | $4,591,560.73 | $4,395,394.43 |
| Low bidof 4 | HAZARD ELIMINATION & SAFETY | MCLENNAN | 2023-04-05 | $723,086.00 | $723,086.00 |
| Rank 2of 3 | BRIDGE REPLACEMENT | HILL | 2023-04-05 | $617,906.50 | $558,558.00 |
| Rank 2of 5 | BASE FAILURE PAVEMENT REPAIR | BOSQUE | 2023-04-05 | $912,982.20 | $902,942.67 |
| Rank 4of 4 | BASE FAILURE PAVEMENT REPAIR | HAMILTON | 2023-04-05 | $691,578.85 | $592,300.37 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | MCLENNAN | 2023-03-08 | $1,233,448.67 | $1,115,328.66 |
| Rank 2of 5 | BASE FAILURE PAVEMENT REPAIR | HILL | 2023-03-08 | $874,603.55 | $860,755.58 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.