Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
752 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | BASE FAILURE PAVEMENT REPAIR | HILL | 2022-05-04 | $889,845.10 | $889,845.10 |
| Rank 2of 2 | SEAL COAT | LIMESTONE | 2022-04-12 | $462,803.00 | $425,408.40 |
| Rank 3of 4 | BRIDGE REPLACEMENT | BURLESON | 2022-04-07 | $1,522,526.24 | $1,449,786.48 |
| Low bidof 1 | ASPHALT | BURLESON | 2022-04-05 | $200,100.00 | $200,100.00 |
| Rank 3of 4 | ASPHALT | GRIMES | 2022-04-05 | $205,800.00 | $200,000.00 |
| Low bidof 1 | ASPHALT | ROBERTSON | 2022-04-05 | $206,000.00 | $206,000.00 |
| Rank 2of 3 | HOT MIX | MCLENNAN | 2022-03-15 | $326,512.50 | $318,250.00 |
| Rank 2of 3 | HOT MIX | BELL | 2022-03-15 | $360,745.00 | $328,375.00 |
| Rank 5of 7 | SURFACING/ROADWAY RESTORATION | COLORADO | 2022-03-04 | $7,614,628.50 | $5,576,114.35 |
| Rank 5of 6 | BASE REPAIR, PLANING, SEAL COAT, 1.5" PFC OL | WALLER | 2022-03-04 | $3,961,606.80 | $3,607,335.29 |
| Rank 2of 5 | BRIDGE REPLACEMENT | MILLS | 2022-03-04 | $1,733,885.20 | $1,685,450.98 |
| Low bidof 3 | CAM AND TOM OVERLAY | MCLENNAN | 2022-03-04 | $2,174,993.18 | $2,174,993.18 |
| Low bidof 1 | FLOWABLE FILL | WALKER | 2022-02-15 | $197,400.00 | $197,400.00 |
| Low bidof 9 | CULVERT REPLACEMENT | WASHINGTON | 2022-02-15 | $234,239.00 | $234,239.00 |
| Rank 3of 3 | FLEXIBLE BASE | WASHINGTON | 2022-02-15 | $119,600.00 | $84,500.00 |
| Rank 2of 2 | FLOWABLE FILL | WASHINGTON | 2022-02-14 | $197,400.00 | $184,000.00 |
| Low bidof 1 | FLOWABLE FILL | FREESTONE | 2022-02-14 | $197,400.00 | $197,400.00 |
| Low bidof 3 | AGGREGATE | WASHINGTON | 2022-02-14 | $95,800.00 | $95,800.00 |
| Low bidof 1 | FLOWABLE FILL | BRAZOS | 2022-02-10 | $197,400.00 | $197,400.00 |
| Low bidof 3 | AGGREGATE | WALKER | 2022-02-10 | $138,480.00 | $138,480.00 |
| Low bidof 3 | ASPHALT PAVEMENT REPAIR | BRAZOS | 2022-02-04 | $1,299,946.94 | $1,299,946.94 |
| Rank 2of 3 | ACP OVERLAY | BRAZOS | 2022-02-04 | $1,690,871.51 | $1,660,054.10 |
| Rank 2of 7 | RECONSTRUCT EXISTING ROADWAY | NAVARRO | 2022-02-03 | $5,086,210.87 | $4,964,579.98 |
| Rank 2of 3 | RESURFACE ROADWAY, MILLED EDGELINE RUMBLE STRIP | HILL | 2022-02-03 | $2,514,675.69 | $2,448,815.72 |
| Rank 3of 4 | PREVENTIVE MAINTENANCE | MILAM | 2022-01-07 | $4,811,504.04 | $3,982,426.27 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.