Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
752 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | SPOT BASE REPAIR | WASHINGTON | 2021-07-01 | $769,287.20 | $638,323.50 |
| Rank 3of 5 | ROCK/RIPRAP | WASHINGTON | 2021-06-08 | $189,800.00 | $176,909.00 |
| Rank 3of 6 | ROCK/RIPRAP | BRAZOS | 2021-06-08 | $178,750.00 | $170,447.00 |
| Low bidof 4 | ROCK/RIPRAP | WALKER | 2021-06-08 | $218,500.00 | $218,500.00 |
| Rank 2of 4 | FLEXIBLE BASE | TRAVIS | 2021-06-04 | $643,500.00 | $565,630.00 |
| Rank 4of 6 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | NAVARRO | 2021-06-04 | $805,468.75 | $627,995.00 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | BELL | 2021-06-04 | $910,822.12 | $749,996.28 |
| Rank 4of 4 | BASE FAILURE PAVEMENT REPAIR | BOSQUE | 2021-06-04 | $789,337.39 | $691,966.43 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2021-06-04 | $587,198.75 | $372,500.50 |
| Rank 5of 7 | REPLACE BRIDGE & APPROACHES | CORYELL | 2021-06-03 | $5,973,525.37 | $5,087,623.20 |
| Low bidof 3 | HAZARD ELIMINATION & SAFETY | BRAZOS | 2021-06-03 | $2,611,581.83 | $2,611,581.83 |
| Rank 4of 5 | HOT MIX | WALKER | 2021-06-03 | $1,183,358.99 | $1,051,583.93 |
| Rank 3of 6 | SPOT BASE REPAIR | BRAZOS | 2021-06-03 | $786,422.50 | $654,817.50 |
| Rank 3of 4 | HMA MILL AND INLAY | WALKER | 2021-06-03 | $1,416,908.80 | $1,225,720.00 |
| Rank 4of 5 | HOT MIX | BELL | 2021-05-06 | $755,775.00 | $656,600.00 |
| Rank 3of 3 | HOT MIX | BOSQUE | 2021-05-06 | $576,050.00 | $543,500.00 |
| Rank 2of 3 | HOT MIX | HILL | 2021-05-06 | $474,287.50 | $458,550.00 |
| Rank 2of 3 | HOT MIX | LIMESTONE | 2021-05-06 | $181,850.00 | $178,000.00 |
| Rank 2of 3 | HOT MIX | FALLS | 2021-05-06 | $586,912.50 | $540,900.00 |
| Rank 4of 9 | BRIDGE REPLACEMENT | NAVARRO | 2021-05-05 | $2,878,943.34 | $2,712,401.60 |
| Rank 3of 3 | BASE FAILURE PAVEMENT REPAIR | MCLENNAN | 2021-05-05 | $744,801.00 | $534,686.20 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | LIMESTONE | 2021-05-05 | $1,110,151.85 | $887,744.65 |
| Rank 3of 4 | BASE FAILURE PAVEMENT REPAIR | FALLS | 2021-05-05 | $229,729.05 | $157,745.45 |
| Rank 4of 6 | BASE FAILURE PAVEMENT REPAIR | HILL | 2021-05-05 | $804,232.40 | $631,827.23 |
| Rank 2of 2 | HOT-MIX COLD-LAID | HOUSTON | 2021-04-12 | $81,750.00 | $80,500.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.