Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
753 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 5 | PEDESTRIAN AND BICYCLE IMPROVEMENTS | BRAZOS | 2017-08-08 | $3,205,597.87 | $1,803,581.23 |
| Rank 2of 6 | OVERLAY | GRIMES | 2017-08-08 | $2,094,851.48 | $2,078,724.66 |
| Rank 3of 4 | HMA MILL AND INLAY | WASHINGTON | 2017-08-08 | $740,304.80 | $648,765.00 |
| Low bidof 7 | REPL BR & APPRS | FALLS | 2017-07-12 | $1,598,158.58 | $1,598,158.58 |
| Rank 3of 5 | HMA MILL AND INLAY | BRAZOS | 2017-07-12 | $718,849.85 | $687,930.00 |
| Rank 3of 5 | HMA MILL AND INLAY | WALKER | 2017-07-12 | $731,966.85 | $672,700.00 |
| Low bidof 5 | SPOT BASE REPAIR | WASHINGTON | 2017-07-12 | $850,911.00 | $850,911.00 |
| Rank 2of 3 | SEAL COAT AND HMA OVERLAY | BRAZOS | 2017-07-12 | $1,578,779.54 | $1,487,658.38 |
| Rank 4of 9 | GR, STRS & SURF | HILL | 2017-07-11 | $72,131,146.07 | $63,963,884.91 |
| Rank 7of 7 | RESTORE ROADWAY | AUSTIN | 2017-07-11 | $5,491,925.14 | $4,469,341.79 |
| Low bidof 4 | SPOT BASE REPAIR | WALKER | 2017-07-11 | $878,327.50 | $878,327.50 |
| Rank 2of 8 | REPLACE EXISTING BRIDGE | GRIMES | 2017-06-07 | $997,190.54 | $905,681.32 |
| Rank 3of 6 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2017-06-07 | $335,009.80 | $305,221.20 |
| Rank 2of 7 | MILL AND INLAY | BOSQUE | 2017-06-07 | $604,111.50 | $595,781.20 |
| Rank 7of 9 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS | KAUFMAN | 2017-06-06 | $4,916,739.40 | $4,087,837.40 |
| Rank 7of 11 | REPLACE EXISTING BRIDGE FACILITY | MILAM | 2017-06-06 | $593,847.75 | $447,590.00 |
| Rank 3of 8 | BASE FAILURE PAVEMENT REPAIR | HAMILTON | 2017-06-06 | $567,212.85 | $510,941.81 |
| Rank 3of 5 | BASE FAILURE PAVEMENT REPAIR | BELL | 2017-06-06 | $1,091,754.25 | $940,401.15 |
| Low bidof 4 | OVERLAY | WALKER | 2017-05-02 | $862,850.00 | $862,850.00 |
| Low bidof 5 | MILL AND INLAY | FALLS | 2017-05-02 | $217,681.35 | $217,681.35 |
| Rank 3of 9 | REPLACE BRIDGE AND APPROACHES | BOSQUE | 2017-04-05 | $1,466,466.30 | $1,451,177.00 |
| Low bidof 5 | FOR THE CONSTRUCTION OF MILL & INLAY HMAC, FDRCP | NAVARRO | 2017-04-05 | $1,989,594.44 | $1,989,594.44 |
| Rank 6of 10 | REPLACE BRIDGE & APPROACHES | BELL | 2017-04-05 | $3,282,495.47 | $2,950,399.18 |
| Low bidof 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAY | NAVARRO | 2017-04-05 | $401,955.00 | $401,955.00 |
| Low bidof 4 | IMPROVE TRAFFIC SIGNALS | BRAZOS | 2017-04-04 | $1,474,037.57 | $1,474,037.57 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.