Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
166 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 5 | ABILENE DISTRICT LARGE SIGNS | TAYLOR | 2025-07-02 | $1,690,336.00 | $1,507,937.50 |
| Rank 2of 7 | GTAO - FY 25 Small Sign Upgrades | TRAVIS | 2025-07-02 | $570,757.50 | $504,526.50 |
| Rank 2of 5 | Hydro-Blasting FY 25 | CONCHO | 2025-07-02 | $1,169,766.90 | $1,141,450.50 |
| Low bidof 3 | FY 2025 SIGNING PROJ (DISTRICTWIDE) | EL PASO | 2025-07-01 | $890,832.68 | $890,832.68 |
| Rank 4of 7 | VA: 0915-00-278: TCD | BEXAR | 2025-06-04 | $4,576,134.55 | $3,977,770.10 |
| Low bidof 11 | PE | Districtwide Striping Project | MCLENNAN | 2025-05-02 | $2,298,505.22 | $2,298,505.22 |
| Rank 2of 4 | FY 26 Amarillo District Paint & Beads | RANDALL | 2025-05-02 | $1,302,000.00 | $1,259,250.00 |
| Rank 3of 5 | VA: 0915-00-298: TCD | BEXAR | 2025-05-01 | $2,205,781.00 | $1,855,565.00 |
| Rank 3of 8 | 2023 HSIP CURVE(SH 73) FLASHING CHEVRONS | JEFFERSON | 2025-05-01 | $802,873.00 | $618,800.00 |
| Rank 2of 4 | RPM FY 2025 | POTTER | 2025-04-23 | $374,410.65 | $329,294.26 |
| Rank 4of 5 | VA,VATYLDISTR,2025THERMO2 | SMITH | 2025-04-03 | $2,802,389.05 | $1,787,718.13 |
| Rank 4of 6 | IH 27 South Large Sign Replacements | POTTER | 2025-04-03 | $2,043,501.40 | $1,712,643.68 |
| Low bidof 5 | SFT | FM 2114 | @ UPRR + BNSF | MCLENNAN | 2025-04-03 | $378,726.35 | $378,726.35 |
| Low bidof 8 | SFT | FM 933 | Patton Lake Rd | FM 1133 | HILL | 2025-03-05 | $926,962.24 | $926,962.24 |
| Rank 2of 7 | 2025 DISTRICT WIDE THERMO #4 | SMITH | 2025-03-05 | $2,030,350.36 | $2,004,522.14 |
| Low bidof 9 | Districtwide PVMT | WEBB | 2025-02-07 | $1,443,018.84 | $1,443,018.84 |
| Rank 6of 8 | Site Specific TY I Striping FY25 | LAMAR | 2025-02-07 | $1,227,783.74 | $1,063,283.67 |
| Rank 3of 7 | FY 2025 Striping - Longline | LUBBOCK | 2025-02-06 | $7,160,017.36 | $7,105,937.80 |
| Rank 3of 6 | Districtwide Thermo Striping FY 2025 | BROWN | 2025-02-06 | $3,139,394.37 | $2,883,374.13 |
| Rank 3of 5 | 25 DISTRICT WIDE THERMO 3 | SMITH | 2025-02-06 | $1,731,722.01 | $1,665,532.18 |
| Low bidof 5 | FY 24 RR Signs & Striping Various Locati | LUBBOCK | 2025-01-07 | $751,868.00 | $751,868.00 |
| Rank 4of 10 | US 84 Stuart St. 0.21 MI S Loop 15 | MILLS | 2025-01-07 | $481,849.00 | $325,100.00 |
| Low bidof 4 | PREVENTIVE MAINTENANCE | EL PASO | 2024-12-04 | $3,964,117.93 | $3,964,117.93 |
| Low bidof 7 | PREVENTIVE MAINTENANCE | LAMAR | 2024-12-04 | $2,803,366.99 | $2,803,366.99 |
| Low bidof 6 | HIGHWAY IMPROVEMENT | ANGELINA | 2024-12-04 | $3,846,146.06 | $3,846,146.06 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.