Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
171 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 8 | ARMOR JOINT REPAIR SL8 OVER HARDY TLL RD | HARRIS | 2020-10-01 | $1,463,604.16 | $845,014.00 |
| Rank 3of 9 | REPLACE BRIDGE AND APPROACHES | MEDINA | 2020-09-04 | $4,847,131.42 | $3,767,334.18 |
| Rank 8of 11 | CONSTRUCT BRIDGE AND APPROACHES | FAYETTE | 2020-09-03 | $15,987,543.72 | $13,635,356.23 |
| Rank 3of 13 | CONSTRUCT DRAINAGE CULVERTS&REPLACE CONCRETE PVMNT | MONTGOMERY | 2020-09-03 | $3,674,494.53 | $3,360,866.55 |
| Low bidof 5 | REPLACE BRIDGE AND APPROACHES | BANDERA | 2020-08-06 | $1,856,894.20 | $1,856,894.20 |
| Rank 6of 6 | REPLACE BRIDGE AND APPROACHES | WALLER | 2020-08-05 | $639,966.95 | $559,763.20 |
| Rank 2of 5 | BRIDGE | LIBERTY | 2020-08-05 | $845,600.31 | $777,585.70 |
| Rank 5of 8 | CONSTRUCT GRADE SEPARATION | COMAL | 2020-07-09 | $14,888,084.47 | $14,284,639.45 |
| Rank 4of 7 | WIDENING OF A NON-FREEWAY | MONTGOMERY | 2020-07-08 | $33,064,813.67 | $29,787,407.89 |
| Rank 9of 10 | WIDEN FROM 2 LANES TO 4-LANE DIVIDED | FORT BEND | 2020-06-04 | $44,503,666.22 | $36,717,603.37 |
| Rank 6of 7 | WIDENING TO A 4-LANE DIVIDED ROADWAY | HARRIS | 2020-05-08 | $23,705,564.65 | $20,384,046.95 |
| Rank 2of 6 | EXPAND 4 TO 6 LNS DIVIDED & INTERSECT OPERATIONS | BEXAR | 2020-05-08 | $7,974,537.22 | $7,947,752.08 |
| Low bidof 10 | INTERSECT OPER IMPROV & INCL WIDEN CIBOLO CRK BRDG | BEXAR | 2020-05-08 | $6,580,022.65 | $6,580,022.65 |
| Rank 7of 11 | CONSTRUCTION OF A 10' WIDE SHARED USED PATH | GALVESTON | 2020-05-08 | $2,799,317.89 | $2,146,673.65 |
| Rank 10of 13 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | HARRIS | 2020-05-07 | $7,096,775.56 | $5,499,459.69 |
| Rank 4of 5 | CONSTRUCT OVERPASS | HAYS | 2020-04-09 | $6,831,036.32 | $5,882,253.87 |
| Rank 4of 5 | REPLACE BRIDGES AND APPROACHES | HARRIS | 2020-03-05 | $3,722,394.17 | $2,898,014.26 |
| Rank 6of 7 | EXPAND 2 TO 4 LN WITH MEDIAN, TURN LN, BIKE LN, SW | BEXAR | 2020-02-07 | $6,767,921.72 | $5,683,753.70 |
| Rank 2of 2 | REPLACE BRIDGE AND APPROACHES | COLORADO | 2020-02-07 | $14,353,733.25 | $12,487,777.17 |
| Rank 2of 7 | CONSTRUCT RAMPS | HARRIS | 2019-10-03 | $2,258,495.63 | $2,241,513.86 |
| Low bidof 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | HARRIS | 2019-09-06 | $12,691,072.79 | $12,691,072.79 |
| Rank 3of 6 | BRIDGE REPLACEMENT | WILSON | 2019-09-06 | $2,144,657.59 | $2,029,110.15 |
| Rank 5of 7 | CONSTRUCT RAMPS | HARRIS | 2019-09-05 | $5,130,458.11 | $4,637,319.22 |
| Rank 4of 5 | WIDEN FROM 2 TO 4 LANES | MONTGOMERY | 2019-08-06 | $71,166,051.50 | $65,322,056.94 |
| Rank 7of 8 | WIDEN FROM 2 TO 4 LANES | FORT BEND | 2019-08-06 | $3,052,078.89 | $2,399,431.61 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.